Laserfiche WebLink
• <br />Conditions for Approval <br />Tentative Parcel Map No. 2003-04 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the Uniform Fire Code, the Uniform <br />Building Code and all other applicable regulations. <br />The applicant must comply in full with each and every condition listed below rior to <br />exercising the rights conferred by this approval. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the tentative parcel map. Failure to comply with each and every condition may <br />result in the revocation of the tentative parcel map. <br />A. Planning Division <br />1. Conditions, covenants and restrictions (CC&Rs) are required prior to final map <br />approval addressing operational standards, common area maintenance, drainage, <br />architecture, parking, circulation, etc. The CC&Rs shall be recorded with the final <br />map. <br />• 2. Two copies of the recorded final parcel map and CC&Rs shall be submitted each to <br />the Planning Division, Building Division and Public Works Agency within 10 days of <br />recordation. <br />3. The tentative parcel map, final map and all improvements required to be made or <br />installed by the subdivider shall be in accordance with the requirements and design <br />standards and specifications of the City of Santa Ana and the requirements of the <br />State Subdivision Map Act. <br />4. Enclosure walls or fences are not permitted at each parcel that may disrupt the flow <br />of on-site circulation or drainage. <br />5. After project occupancy, landscaping is to be maintained in accordance with the <br />landscape plan approved for the project. This shall include the minimum levels of <br />plant materials shown on the landscape plan and installed at the time of occupancy. <br />• <br />Resolution No. 2003-20 <br />Page 4 of 4 <br />