My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2003
>
2003-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:55:43 PM
Creation date
10/27/2010 3:41:50 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP02-32
Date
1/27/2003
Notes
3801 S Bristol St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. To the extent feasible, equipment engines shall be maintained in good <br />• condition and in proper tune according to manufacturer's specifications. <br />9. To the extent feasible, gasoline powered equipment shall be used for <br />onsite and offsite construction activities. <br />10. Prior to issuance of building permit, the applicant shall submit for review <br />and approval a surface drainage/grading/erosion control plan prepared by <br />a registered Civil Engineer, showing the direction and means of flow to the <br />adjacent street. The plan is to include existing and proposed elevations at <br />and adjacent to all property lines. Drainage routed to the street must be <br />directed beneath the sidewalk and through the curb. <br />11. Prior to issuance of a grading permit, the applicant shall prepare an <br />NPDES post-construction storm water management plan per Orange <br />County Drainage Area Management Plan (DAMP) that includes all <br />structural and non-structural Best Management Practices. <br />12. Submit and have approved a surface drainage/utility plan that includes all <br />Structural Best Management Practices. <br />13. Provide two copies of the Water Quality Management plan that includes a <br />description of all applicable Structural and Non-Structural Best <br />• Management Practices, which may apply to this project. <br />14. The fuel dispensing area for this project shall be paved with concrete and <br />shall extend six and one half feet from the corner of each fuel dispenser in <br />any direction. <br />15. The fuel dispensing area shall be provided with a canopy structure <br />extending over the concrete paved fuel dispensing area. <br />16. The Fuel dispensing area shall be graded and constructed so as to drain <br />to an underground clarifier, sump or tank with ashut-off valve to prevent <br />discharge of spilled chemicals and contaminants into storm drain system. <br />17. The trash enclosure area shall be either fully roofed or to drain into a <br />water quality inlet to prevent discharge of petroleum compounds and <br />grease into the storm drain system. <br />B. Police Department <br />1. No alcoholic beverages shall be consumed on any property adjacent to <br />the licensed premises under the control of the licensee. <br />2. The petitioner shall be responsible for maintaining free of litter the area <br />• adjacent to the premises over which he has control. <br />EXHIBIT "A" <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.