My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2003
>
2003-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:55:43 PM
Creation date
10/27/2010 3:45:13 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP02-30
Date
1/27/2003
Notes
2302 E 17th St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 9. To the extent feasible, equipment engines shall be maintained in good <br />condition and in proper tune according to manufacturer's specifications. <br />10. To the extent feasible, gasoline powered equipment shall be used for on- <br />site and off-site construction activities. <br />11. Prior to issuance of grading permit, the applicant shall submit for review <br />and approval a surface drainage/grading/erosion control plan prepared by <br />a registered Civil Engineer, showing the direction and means of flow to the <br />adjacent street. The plan is to include existing and proposed elevations at <br />and adjacent to all property lines. Drainage routed to the street must be <br />directed beneath the sidewalk and through the curb. <br />12. Prior to issuance of a grading permit, the applicant shall prepare an <br />NPDES post-construction storm water management plan per Orange <br />County Drainage Area Management Plan (DAMP) that includes all <br />structural and non-structural Best Management Practices. <br />a. Submit and have approved a surface drainage/utility plan that <br />includes all Structural Best Management Practices. <br />• b. Provide two copies of the Water Quality Management plan that <br />includes a description of all applicable Structural and Non- <br />structural Best Management Practices, which may apply to this <br />project. <br />13. Building plans shall reflect that the proposed project is fitted with a grease <br />interceptor to the size and capacity as designated by the Building and <br />Safety Division of the City of Santa Ana to Mitigate impacts on the local <br />sanitary sewer system and regional water quality. Such grease <br />interceptor shall be regularly maintained so as to remain fully functional. <br />14. Trash enclosures for the proposed project shall be one of the following: <br />fully roofed, drained into water quality inlet, an engineered filtration <br />system, or an equally effective alternative. <br />B. Police Department <br />1. Cash register must be visible from the street at all times and shall not be <br />obstructed at any time by temporary or permanent signage. <br />2. Window displays must be kept to a minimum for maximum visibility and shall <br />not exceed 25 percent of window coverage. <br />• <br />Exhibit "A" <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.