My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-12
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2005
>
2005-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:55:11 PM
Creation date
11/1/2010 2:19:47 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP05-08
Date
4/25/2005
Notes
100 W MacArthur Blvd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Conditions for Approval for Variance No. 2005-04 <br />Variance No. 2005-04 is approved subject to compliance, to the reasonable satisfaction <br />of the Planning Manager, with all applicable sections of the Santa Ana Municipal Code, <br />the California Administrative Code, the Uniform Fire Code, the Uniform Building Code and <br />all other applicable regulations. <br />The applicant must comply in full with each and every condition listed below rip or to <br />exercising the rights conferred by this variance. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the variance. Failure to comply with each and every condition may result in the <br />revocation of the variance. <br />A. Planning Division <br />1. The project shall remain in compliance with Site Plan Review DP No. 04- <br />96. <br />2. Any amendment to this conditional use permit must be submitted to the <br />Planning Division for review. At this time, staff will determine if <br />administrative relief is available or the conditional use permit must be <br />S amended. <br />Mitigation Measures <br />3. During construction, the contractor is required to comply with SCAQMD <br />Fugitive Dust Rule 403 to suppress dust generated by construction <br />operations. <br />4. All materials excavated or graded will be sufficiently watered to prevent <br />excessive amount of dust. <br />5. All clearing and earthwork activities shall cease during period of high <br />winds (winds greater than 25 mph averaged over one hour) or during <br />Stage 1 or Stage 2 smog episodes. <br />6. Streets surrounding the project site should be cleaned at the end of each <br />day of construction. <br />7. All materials transported off-site shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. <br />8. Equipment engines shall be maintained in good condition and in proper <br />tune according to manufacturer's specifications. <br />EXHIBIT "B" <br />
The URL can be used to link to this page
Your browser does not support the video tag.