My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-12
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2005
>
2005-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:55:11 PM
Creation date
11/1/2010 2:19:47 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP05-08
Date
4/25/2005
Notes
100 W MacArthur Blvd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. All materials excavated or graded will be sufficiently watered to prevent <br />• excessive amount of dust. <br />9. All clearing and earthwork activities shall cease during period of high <br />winds (winds greater than 25 mph averaged over one hour) or during <br />Stage 1 or Stage 2 smog episodes. <br />10. Streets surrounding the project site should be cleaned at the end of each <br />day of construction. <br />11. All materials transported off-site shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. <br />12. Equipment engines shall be maintained in good condition and in proper <br />tune according to manufacturer's specifications. <br />13. To the extent feasible, gasoline powered equipment shall be used for on- <br />site and off-site construction activities. <br />14. The approved site plan for the project shall show the location of all <br />monitoring wells on the project site. The site plan shall reflect that the <br />monitoring wells would be accessible for monitoring and maintenance <br />during the construction and operation of the project. <br />15. Prior to issuance of building permit, the project applicant shall coordinate <br />with the John Wayne Airport Land Use Commission. <br />16. Building plans for the proposed project shall identify Best Management <br />Practices that shall be employed during construction operations to <br />minimize water quality impacts. <br />17. Construction plans for the project shall reflect that construction operations <br />would be limited to 7:00 a.m. to 8:00 p.m. Monday through Saturday, with <br />no construction permitted on Sundays or Federal Holidays. <br />18. Prior to issuance of building permits, the applicant shall submit evidence <br />to the Planning and Building Agency that appropriate school impact fees <br />have been paid. <br />B. Police Department <br />1. The existing building and parking lot must conform to the provisions of <br />Chapter 8, Article II Division 3 of the Santa Ana Municipal Code <br />(Building Security Ordinance). These code conditions will require that <br />the existing project's lighting, door/window locking devices and <br />EXHIBIT "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.