My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY FLOOD CONTROL DISTRICT (5) - 2010
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY FLOOD CONTROL DISTRICT (5) - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 1:15:29 PM
Creation date
11/4/2010 10:19:09 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY FLOOD CONTROL DISTRICT
Contract #
A-2010-203
Agency
PUBLIC WORKS
Council Approval Date
10/18/2010
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. CONSTRUCTION AND MAINTENANCE (PMES2.2S) <br />GRANTEE shall have all construction and/or maintenance plans approved in writing by DISTRICT'S <br />Director OC Public Works, or designee, (hereinafter referred to as "Director") prior to commencement of any <br />work in, on or about the Easement Area; and upon completion of any such work, GRANTEE shall <br />immediately notify Director in writing of such completion. <br />Director's approval of GRANTEE'S construction and/or maintenance plans shall not be deemed approval <br />from the standpoint of structural safety, suitability for purpose or conformance with building or other codes or <br />other governmental requirements. DISTRICT is not responsible for permitting of any construction and/or <br />maintenance, design, assumptions or accuracy of GRANTEE'S construction and/or maintenance plans. <br />Director will rely on the professional expertise of the Engineer of Record when approving GRANTEE'S <br />construction and/or maintenance'plans. <br />GRANTEE hereby acknowledges that the Easement Area lies within a portion of a flood control facility, <br />commonly referred to as the Santa Ana River Channel thereinafter "the Chanmel"). <br />GRANTEE shall perform all construction and/or maintenance in such a manner that will allow for <br />unobstructed flood control operations and maintenance of the Channel by DISTRICT. <br />Should it be necessary for GRANTEE to conduct any construction or excavation activities or otherwise <br />disturb the surface of the Easement Area subsequent to the completion of the initial installation of <br />GRANTEE'S Facilities, GRANTEE agrees to notify Director in writing sixty (60) days in advance of such <br />planned activities, obtain Director's written approval of all plans, and obtain a permit for construction from <br />the County of Orange ("County") with payment of normal processing fees prior to commencement of any <br />such activities. Said approval shall not be withheld unreasonably, nor shall said approval be necessary in any <br />emergency situation or in conducting routine maintenance activities which do not involve disturbance of the <br />surface area. <br />Except in designated environmentally sensitive areas, GRANTEE shall have the right to cut such roots as may <br />endanger or interfere with GRANTEE'S Facilities provided, however, that any excavation shall be made in <br />such a manner as will cause the least injury to the surface of the ground and any improvements and/or <br />landscaping around such excavation, and that the earth so removed shall be replaced and the surface of the <br />ground and any improvements and/or landscaping around such excavation, damaged shall be promptly, <br />restored by GRANTEE at its expense to the same condition as existed prior to excavation, to Director's <br />satisfaction. <br />GRANTEE shall, at no cost to DISTRICT, maintain in good repair and in safe condition all Facilities <br />conslyucted, used or placed upon the Easement Area by or on behalf of GRANTEE pursuant to this Easement <br />Deed. <br />2. REMOVAL AND/OR ABANDONMENT (PMES3.IS) <br />GRANTEE agrees that in the event (a) GRANTEE'S Facilities are no longer required, or (b) GRANTEE'S <br />use of said Facilities ceases for a continuous period of more than one (1) year without written notice. fiom <br />GRANTEE to DISTRICT of the circumstances affecting such suspension and of GRANTEE'S intention to <br />resume usage of the facilities, GRANTEE shall, at Director's request and at no cost to DISTRICT, remove <br />and/or abandon said Facilities within niniety (90) days after receipt of written notice from Director to remove <br />and/or abandon. Following such removal and/or abandonment, GRANTEE shall, at no cost to DISTRICT, <br />restore the. Easement Area, to the condition that existed prior to the granting of this Easement Deed, to <br />Director's satisfaction. <br />Street/Highway Easement - OCFCD to City of Santa Ana 2 08/04/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.