My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC SYSTEMS ELECTRIC 2B - 2010
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
PACIFIC SYSTEMS ELECTRIC 2B - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:55:04 AM
Creation date
11/4/2010 11:58:28 AM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC SYSTEMS ELECTRIC
Contract #
A-2009-104-01
Agency
FINANCE & MANAGEMENT SERVICES
Expiration Date
8/31/2011
Insurance Exp Date
2/2/2011
Destruction Year
2017
Notes
Amends N-2008-108, A-2009-104 Amended by A-2009-104-02
Document Relationships
PACIFIC SYSTEMS ELECTRIC 2 - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
PACIFIC SYSTEMS ELECTRIC 2A - 2009
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
PACIFIC SYSTEMS ELECTRIC 2C - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGNATEII TANK OWNER / OPERATOR SERVICES <br />PSE will provide monthly inspection services and annual training as Designated Operator for <br />each location per SWRCB regulation. Each location will include the following monthly <br />inspection protocol. Plus, a plan specific to each location will be developed to include additional <br />inspection items at the discretion of PSE to supplement these items: <br />1. PSE will send a letter to the Local Agency that identifies this firm as the designated tank <br />operator for each City Dept UST location and that the UST's are in compliance with all <br />applicable underground storage tank requirements. <br />2. PSE will provide a copy to each location to be kept with the tank, log records of a <br />Certificate indicating completion of the California UST System Operator exam. <br />3. PSE will perform monthly visual inspections of all UST -systems at each location. <br />Results of inspection shall be recorded in a monthly inspection report form that will include the <br />following items'that will be supplemented as indicated above: <br />A. Review alarm history report for the previous month, checking that each alarm <br />condition was documented and responded to appropriately. A copy of the alarm history report or <br />log, along with documentation describing action taken in response to any alarms(s), shall be <br />attached to the monthly visual inspection record. <br />B. Inspect for the presence of hazardous substance, water, or debris in spill <br />containers. <br />C. Inspect for the presence of hazardous substance, water, or debris in under <br />dispenser containment areas, and checking that the monitoring equipment in these areas is <br />located in the proper position to detect a leak at the earliest possible opportunity. <br />D. Inspect for the presence of hazardous substance, water, or debris in containment sumps that, in <br />the past month, have had an alarm for which there is no record of a service visit, and checking <br />that the monitoring equipment in these containment sumps is located in the proper position to <br />detect a leak at the earliest possible opportunity. <br />E. Check that all required testing and maintenance for the underground storage tank system have <br />been completed, and documenting the dates these activities occurred. <br />F. Verifying that all facility employees have been trained in accordance with <br />subdivision 2715(f) of Title 23, SWRCB regulation. <br />4. PSE will provide each location with a copy of each monthly inspection report, and alert <br />the owner or operator of any condition discovered during the monthly visual inspection that may <br />require follow up actions. <br />5. PSE will train the facility employees responsible for the UST operations in the proper <br />maintenance and operation of the UST system annually as required by regulation. Newly hired <br />facility employees shall be trained within 30 days, of the date of hire. <br />
The URL can be used to link to this page
Your browser does not support the video tag.