My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2010
>
2010-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:54:22 PM
Creation date
11/8/2010 2:51:45 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP10-02
Date
4/12/2010
Notes
1209 E Wakeham Av
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. Branch foliage color should be an olive green with some brown <br />"needles" to match an actual Canary Island Pine. A sample should be <br />submitted for approval prior to fabrication. <br />h. Full bark cladding with a custom color should be submitted for approval <br />prior to fabrication. <br />i. All antennas shall be covered with "pine antenna socks" that match the <br />approved foliage color. <br />All "stand-off mounts" and support pipe mounts shall be concealed <br />behind antennas and painted a darker shade or green (or black) with a <br />"flat" paint finish to reduce reflection and visibility of the mounting. <br />k. Include the tree specifications (selected manufacturers and models) <br />with photo simulations (also a site plan review requirement). <br />Show the location of the GPS antenna on all elevations. <br />m. Provide a "unistrut" detail for the utility cabinet; an "H-frame" is not <br />acceptable. <br />• n. Provide a note on the plans stating "install underground utilities <br />sleeving for two carriers during construction of the structure." Shrouds <br />on the outside of the pole are not acceptable. <br />o. All exterior conduit and electrical meters shall be installed and <br />screened in one metal enclosure painted to match the structure. <br />5. Two live pine trees, each a minimum 36-inch box, are to be planted to the <br />west and south of the monopine to provide additional stealthing of this <br />facility. <br />6. The permit applicant recognizes that the frequencies used by the cellular <br />facility located at 1209 East Wakeham Avenue are extremely close to the <br />frequencies used by the City of Santa Ana for Public Safety. This <br />proximity will require extraordinary "comprehensive advanced planning <br />and frequency coordination" engineering measures to prevent <br />interference, especially in the choice of frequencies and radio ancillary <br />hardware. This is encouraged in the "Best Practices Guide" published by <br />the Association of Public-Safety Communications Officials-International, <br />Incorporated (APCO), and as endorsed by the Federal Communications <br />Commission (FCC). Prior to the issuance of any permits to install the <br />facility, (permit applicant) shall meet in good faith to coordinate the use of <br />frequencies and equipment with the Communications Division of the <br />• Orange County Sheriff-Coroner Department to minimize, to the greatest <br />Resolution No. 2010-06 <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.