My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19F - RFP - HARBOR MIXED USE TRANSIT CORRIDOR PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
11/15/2010
>
19F - RFP - HARBOR MIXED USE TRANSIT CORRIDOR PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:57:43 PM
Creation date
11/10/2010 7:58:43 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19F
Date
11/15/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Requested Plannine Services: <br /> The preliminary framework for the Scope of Work for the project is as follows: <br /> <br /> TASK 1: <br /> INITIAL ANALYSIS AND FINALIZATION OF THE PROJECT PARAMETERS <br /> TASK 1.1 -PROJECT KICK-OFF MEETING and STRATEGY SESSION #1• INITIAL <br /> OPPORTUNITIES AND CONSTRAINTS <br /> The project team will meet to kick-off the project. The purpose of this kick-off meeting <br /> will be to ensure that all project participants agree with the project scope, the deliverables, <br /> and the overall goals for this project. Each task of the project scope will be reviewed and <br /> discussed to get a general consensus on the proposed task. The meeting will allow the City <br /> to introduce the Corridor and provide the opportunity to discuss the initial opportunities and <br /> constraints identified along the Harbor Boulevard Corridor. The City will share their initial <br /> thoughts about their vision for the Corridor, and what opportunities and potential the <br /> Corridor offers. The City will also share the constraints that have kept the Corridor <br /> stagnant, and the opposition's view of the City's vision of the Corridor. A site visit along <br /> the Corridor is optional. <br /> TASK 1.2 - BASE MAPPING AND DOCUMENT COLLECTION <br /> Base maps of the study corridor will be produced for use throughout all project tasks. These <br /> maps should incorporate the study area of the corridor, and project team members should be <br /> able to use the base maps to enhance any analysis or reports they will produce for other <br /> tasks. The maps should also be easy to manipulate by project team members so the <br /> visualization of any data or graphics can be incorporated onto the maps. <br /> The City will make available all relevant studies, analyses, reports, maps, and/or data for <br /> this task. <br /> TASK 1.3 - DETAIL EXISTING LAND USE INVENTORY FOR PROJECT AREA <br /> AND ADJACANT TRANSPORTATION ANALYSIS ZONES (TAZ) <br /> Data will be gathered to conduct a detailed existing land use inventory for the project area <br /> and adjacent transportation analysis zones (TAZ). The data will be provided by the City <br /> and SCAG. The existing land use data will be incorporated into the Santa Ana Property <br /> Information Network and SCAG's Sustainability Tool. <br /> TASK 1.4 - INITIAL CORRIDOR-SEGMENT RETAIL ASSESSMENT <br /> The selected consultant shall conduct a preliminary retail assessment along the corridor. <br /> The assessment will include existing conditions of retail along the corridor. It will also <br /> include a preliminary assessment of retail opportunities and constraints of the Corridor in <br /> order to guide the rest of the study, and to provide a foundation of framework for the <br /> supplemental tasks. <br /> TASK 1.5 - REDEVELOPMENT POTENTIAL ANALYSIS <br /> The selected consultant shall analyze the redevelopment potential of the Corridor. The <br /> analysis will identify of potential redevelopment sites, different types of redevelopment, and <br /> different samples of redevelopment completed on Corridors of the same characteristics. <br /> <br /> <br /> <br /> <br /> <br /> A A C <br /> ¦ v ¦ v <br />
The URL can be used to link to this page
Your browser does not support the video tag.