Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> TASK 3.2 EVALUATE CRITERIA POLLUTANT EMISSIONS <br /> <br /> SRA will estimate the emissions associated with the proposed project. The analysis will address <br /> potential increases in area sources (energy use, landscaping, etc.) and vehicle emissions. In <br /> addition, SRA will address potential emissions associated with cooking and vehicle idling in the <br /> drive-through. Because of the size of the project, SRA assumes that no CO "hot spots" analysis will <br /> be required. In the event that the traffic analysis indicates a degradation in Level of Service due <br /> to project-related traffic, the analysis for the CO "hot spots" will be considered additional services. <br /> SRA will also conduct a Localized Significance Analysis based on on-site emissions associated <br /> with vehicle idling and McDonald's operations. <br /> TASK 3.3 GLOBAL CLIMATE CHANGE EVALUATION <br /> <br /> To address the requirements of the recently adopted CEQA guidelines, SRA will conduct a <br /> greenhouse gas analysis in accordance with CEQA requirements and SCAQMD draft guidance. <br /> The analysis will include quantification of emissions of greenhouse gases, a discussion of the <br /> consistency of the project with the applicable Climate Action Plan(s), and a discussion of the <br /> project's consistency with the goals of AB 32. Because of the size of the project, SRA anticipates <br /> that the analysis will demonstrate that emissions would not result in a significant impact on <br /> global climate. <br /> If required, SRA assumes that McDonald's will provide information on projected energy and <br /> water use for the project that will serve as the basis for the evaluation, along with proposed <br /> measures to reduce greenhouse gas emissions such as energy efficiency measures and water <br /> conservation measures. <br /> <br /> TASK 3.4 PREPARE TECHNICAL REPORT <br /> <br /> SRA will prepare an Air Quality Technical Report and Global Climate Change Report that <br /> summarize the analysis conducted for Tasks 3.1 through 3.3. The reports will summarize the <br /> results of the analyses. SRA assumes we will address one round of comments in this task. <br /> <br /> TASK 4 TRAFFIC IMPACT STUDY <br /> <br /> A traffic impact study will be prepared in accordance with the traffic study requirements of the <br /> City of Santa Ana. The traffic study will address the project's traffic-related impacts on the street <br /> system surrounding the project site. The study will also provide an evaluation of site access, on- <br /> site circulation, and drive-through queuing. The following tasks are envisioned. <br /> • Conduct a site visit to observe existing traffic conditions on the streets surrounding the <br /> project site and at the study intersection. <br /> <br /> • Obtain a copy of the project site plan for the proposed project, including building square <br /> footages and uses, site layout, site driveways, parking supply, and any other site features <br /> that will affect the traffic analysis. <br /> <br /> <br /> City of Santa Ana - S - Kimley-Horn and Associates, Inc. <br /> MND for McDonald's Restaurant April 30, 2010 <br /> <br /> 25G-17 <br />