Laserfiche WebLink
OTETRA TECH <br />Exhibit "A" <br />San Lorenzo Sewage Lift Station — Additional Services Request <br />Page 2 <br />Task No. 4: Estimate Truck/Equipment For Various Stages of Construction. Tetra Tech will <br />provide estimate of the number and types of vehicles /equipment required for the various stages of <br />construction. We are requesting a budget of $1,400 for this additional service. <br />Task No. 5: Respond to Request for Additional Information. Tetra Tech will provide additional <br />information as requested on construction methods, odor control system, etc. This is in addition to the <br />normal question/answers included in Task No. 1. We are requesting a budget of $3,800 for this <br />additional service. <br />Task No. 6: Update Electrical Plans and Resubmit far Electrical Permit. Tetra Tech will update the <br />electrical plans to incorporate any code changes and resubmit for electrical permit. The electrical plans <br />were completed based on California Code 2007. The comments from the first electrical plan check <br />comments were already taken care of. Therefore, the level of effort to perform the updates should be <br />minimal. We are assuming the major change that may be required will be performing the Title 24 <br />energy calculations. We are requesting a budget of $6,200 for this additional service. <br />Task No. 7: Incorporate Mitigation Measures into Plans and Specifications. Tetra Tech will revise <br />the project plans, specifications and cost estimate to incorporate any additional mitigation measures <br />identified in the final EIR. We are requesting a budget of $1,500 for this additional service. <br />Task No. 8: Preliminary Layout and Cost to Move Building. Tetra Tech was requested to prepare a <br />preliminary layout and construction cost estimate to move the building out of the existing adjacent <br />property. This work was performed to assist the City in the acquisition of the proposed easement. We <br />are requesting our budget be increased by $4,000 to compensate us for this additional work. <br />Task No. 9: Update Specifications due to Delay. The EIR process will be delaying the completion of <br />the plans and specifications until at least January 2011. This is a two year delay from the date of the <br />previously signed plans and specifications. Tetra Tech will need to confirm the manufacturer/ <br />equipment specifications to make sure the equipment model/type specified is still available and <br />appropriate. We are requesting a budget of $2,000 for this additional service. <br />Task No. 10: Delay in Construction Phase Support. The original proposal assumed construction <br />would be completed by June 2007. Our July 17`t', 2007 approved extra increased our budget for <br />construction phase support assuming would be completed by December 2009. Based on the estimated <br />schedule of completing the EIR by early 2011, we are estimating that construction of the project will <br />not be completed until end of 2012. <br />This additional three year delay will impact the assumed cost to perform the construction support <br />services. Our current approved Construction Phase Support budget is $47,400 (original proposal <br />in <br />amount of $43,100 and additional $4,300 per July 17`h, 2007 approved extra). We are requesting a 12% <br />increase in the construction phase support to compensate Tetra Tech for this three year delay, or an <br />increase of $5,600. With this increase, our Construction Phase Support Budget will be $53,000. <br />