My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-18 Regular
Clerk
>
Minutes
>
CITY COUNCIL
>
2010-2019
>
2010
>
2010-10-18 Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2019 4:57:44 PM
Creation date
11/18/2010 4:02:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Minutes
Agency
Clerk of the Council
Date
10/18/2010
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSA <br />WORK STUDY SESSION <br />FIXED GUIDEWAY UPDATE — Public Works Agency <br />Santa Ana Transit Vision -Phase 1 <br />Santa Ana -Garden Grove Fixed Guideway <br />Project Purpose <br />❖ Provide a safe, convenient and reliable public transportation option <br />❖ Spur economic development opportunities and create jobs <br />❖ Increase accessibility and livability in the heart of Orange County <br />❖ Promote sustainable and environmentally responsible <br />transportation <br />❖ Serve as a link to destinations within and surrounding Santa Ana <br />Connecting Neighborhoods, Businesses and Activity Centers <br />OCTA "Go Local" Process <br />Step 1 <br />• Identify transit concepts to link major activity & employment centers <br />to Metrolink stations <br />• Identify wide range of routes & transit technologies <br />Step 2 <br />• Refine concepts in coordination with stakeholders & the public <br />• Conduct alternatives analysis, conceptual engineering & <br />environmental review on "reduced set" of concepts <br />• Refine cost estimates & develop funding plan <br />Step 3 <br />• Preliminary engineering (with FTA concurrence) <br />• Final design & construction <br />• Implementation <br />Step 4 <br />• Once Go Local programs are operating, OCTA will perform <br />additional upgrades to Metrolink stations to ensure passengers can <br />connect seamlessly to the various transit services <br />City of Santa Ana at Step 2 - Study Process: Public Outreach <br />Fir�aC , i� +ffi�tl'iMIFT�t6 <br />u�r�ir d ` nl <br />Recard of <br />CITY COUNCIL MINUTES 17 OCTOBER 18, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.