My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - TRAFFIC SIGNAL INSTALLATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
12/06/2010
>
23B - TRAFFIC SIGNAL INSTALLATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:56:49 PM
Creation date
12/2/2010 1:05:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23B
Date
12/6/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: <br />DECEMBER 6, 2010 <br />TITLE: APPROVED <br />INCREASED CONTINGENCY FOR ? As Recommended <br />TRAFFIC SIGNAL INSTALLATION ? As Amended <br />AND MODIFICATION AT FOUR ? Ordinance on 151 Reading <br />? Ordinance on 2"d Reading <br />LOCATIONS (PROJECT NOS. 085017, ? Implementing Resolution <br />085021, 085022 AND 085023) ? Set Public Hearing For <br />CONTINUED TO <br />CITY MANAGER <br />FILE NUMBER <br />RECOMMENDED ACTION <br />Increase the contingency for the contract with Lincoln Pacific Builders, Inc. for Traffic Signal <br />Installation and Modification at four locations by $52,300 to a total estimated contract amount of <br />$793,166 and authorize the City Manager to execute a change order in an amount not to <br />exceed the authorized contingency. <br />DISCUSSION <br />Last year the City awarded a contract for Traffic Signal Installation and Modification at four <br />locations to Lincoln Pacific Builders, Inc. in the estimated amount of $673,515 plus a <br />contingency of $67,351 totaling $740,866. One of the four locations is the traffic signal <br />modification at Flower Street and Santa Ana Boulevard. <br />When this intersection was originally designed, the project scope was reduced by eliminating the <br />upgrade to the signal communication system to stay within the available Hazard Safety <br />Improvement grant funds. With an actual bid that is lower than the available funding, the City is <br />able to include the signal communication system upgrade. This upgrade requires the approval <br />of a change order. <br />A change order in an amount not exceed $52,300 is required to upgrade the signal <br />communications system. This modification will be paid based on a per unit basis, subject to the <br />not to exceed amount. <br />ENVIRONMENTAL IMPACT <br />This is no environmental impact associated with this action. <br />23B-1
The URL can be used to link to this page
Your browser does not support the video tag.