My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - ENVIRONMENTAL SERVICES THE PLANNING CENTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
12/06/2010
>
25B - ENVIRONMENTAL SERVICES THE PLANNING CENTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:56:52 PM
Creation date
12/2/2010 1:05:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25B
Date
12/6/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
View images
View plain text
November 9, 2010 <br />Page 10 <br />TASK 9 PROJECT MANAGEMENT <br />The Planning Center will coordinate closely with the City to ensure that the PEIRand associated documents are legally <br />defensible, accurate, and useful to decision makers when considering the approval of the project. Project <br />management responsibilities include: task scheduling and assignment; management of resources; monitoring of costs <br />and schedule adherence; management and coordination of subconsultants, including contract administration and <br />accounting; consultation and coordination with local and state entities relative to the environmental review process; <br />and coordination and communications with the City's project team to ensure compliance with policies, procedures, <br />and any applicable codes. <br />Deliverable(s): <br />- Project Management and Administration for an approximate 9-month schedule, as detailed in the attached <br />schedule. <br />Proposed Schedule <br />We will work at the outset of the project to develop a schedule that meets the needs of the City. Attached is an MS <br />Project schedule developed for the Harbor Boulevard Corridor Vision Plan PEIR based on required CEQA review periods <br />and our understanding of the City's scheduling objectives for this project. As shown, based on provision of a complete <br />project description by November 2010, we estimate that the Final PEIR could be certified by July 2011. <br />Cost Estimate <br />The Planning Center proposes to conduct the scope of services identified in this proposal for a not-to-exceed fee of <br />$152,184. As noted below, the Cost Estimate does not include reproduction and distribution costs associated with <br />public review copies of the documents (IS/NOP, Draft PEIR, FEIR) or filing fees required by the County of Orange. If <br />requested, The Planning Center can prepare hardcopies/CD copies for public distribution at cost plus 10 percent, <br />which is estimated at $12,300. Our assumptions and deliverables are detailed in the previous section. We remain <br />open to modifying our scope of services and associated fee based on any changes desired by the City. The table below <br />presents the costs detailed by task. Any additional costs accrued during the project that are outside the scope of work <br />identified in this proposal will 'be billed according to our standard schedule of fees. <br />25B-20
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).