My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2010-12-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
12/06/2010
>
FULL PACKET_2010-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:51:46 PM
Creation date
12/2/2010 1:46:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
12/6/2010
Destruction Year
2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Customized Training Plan <br />I. GENERAL <br />Exhibit A <br />1. <br />Name of Employer: <br />Tenacore <br />2. <br />Address of Work -site: <br />1525 E. Edinger Ave. Santa Ana CA 92705 <br />3. <br />Phone Number: <br />714- 444 -4643 <br />4. <br />Training Supervisor: <br />Jaz Singh Director of Operations <br />5. <br />Number of Trainees <br />up to 12 <br />6. <br />Trainee Wages at time of training $12.50 hr <br />7. <br />Trainee Wages at completion of training $13.50 hr <br />II. TRAINING OUTLINE: <br />1. <br />Project Length: <br />3 months <br />2. <br />Total Training Hours: <br />200 hours (approximately 16 hours per week <br />3. <br />Training Type: <br />Classroom and Hands -On Training <br />4. <br />ONET Code: <br />49 -9062 <br />5. <br />SVP Level <br />6.0 <br />6. Occupation/Product or Service: Ultrasound Probe Technolo <br />7. Curriculum: <br />The curriculum Plan includes the following class titles, dates: <br />1. Class: Overview of ultrasound probe technology <br />Dates: December 13 — December 17 <br />2. Class: Diagnosis and identification of common micro - coaxial cable failure points <br />Dates: December 20 — December 24 <br />3. Class: Soldering high - density micro - coaxial cable of 40 gauge or smaller <br />Dates: December 27 — January 7 <br />4. Class: Quality assurance procedures for the soldering processes <br />Dates: January 10 — January 14 <br />5. Class: Ultrasound array technology overview <br />Dates: January 17 — January 21 <br />6. Class: Soldering to ultrasound arrays <br />Dates: January 24 — February 4 <br />25H -12 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.