My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT ENVIRONMENTAL MANAGEMENT, INC. 3 - 2010
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
TAIT ENVIRONMENTAL MANAGEMENT, INC. 3 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 1:24:03 PM
Creation date
12/15/2010 11:23:56 AM
Metadata
Fields
Template:
Contracts
Company Name
TAIT ENVIRONMENTAL MANAGEMENT, INC.
Contract #
N-2010-112
Agency
FIRE
Expiration Date
10/31/2011
Insurance Exp Date
9/1/2011
Destruction Year
2016
Notes
09/09/2011 - Need current GL and Prof Liab.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />The preparation of a strategic and comprehensive work plan approach is key to ensuring that the <br />maximum benefit is received by the SAFD. Tait's approach focuses on working as a partner and team <br />member with the SAFD. Attention to the SAFD's short and long term goals will be foremost and not an <br />exercise in mechanical process. Tait's approach to the performance of this work is outlined in the <br />following sections. <br />Information needed to prepare the Area Plan will be derived from existing documents and databases for <br />the majority of the requirements. The following scope of work will be provided in order to prepare a <br />working Area Plan document that can be utilized to facilitate "ready information" availability during <br />incidents where hazardous materials emergency response activities are warranted and for pre -planning <br />purposes prior to their occurrences: <br />• Attend a "kick-off' meeting with the SAFD to jointly strategize on the goals and objectives of the <br />project. This stage is critical to ensure that the sufficient and reliable information/data are <br />collected, negating the need for iterative, costly and time-consuming field investigation <br />activities. This initial meeting will include all key personnel and will be followed by additional <br />meetings between SAFD and Tait as often as necessary to discuss technical work and <br />management related issues. <br />• Review existing plans and information to identify data gaps. It is important to not just "screen" <br />the information, but to evaluate it for its accuracy and clarity. Based upon the review, Tait will <br />advise the SAFD's Project Manager of data gap(s), their significance in relation to the project <br />goals/data objectives, and on data collection alternatives to address the data gap. <br />• Prepare an outline of the proposed Area Plan and present to the SAFD. The outline will include <br />details of the proposed additions, deletions, and any organization of the existing Area Plan. <br />Electronic copies of the outline will be sent via email to County staff for review. Paper copies will <br />be mailed using an overnight delivery service or presented at meetings as appropriate. <br />• Obtain existing emergency protocol and contact information used in Incident Command System <br />organizational processed. Prepare an Area Plan specific for the jurisdictional boundaries of Santa <br />Ana in accordance with the guidelines set forth by the California Health and Safety Code, <br />CalEMA and FEMA guidance, as presented in the section below. <br />• Provide the SAFD, with hardcopy and CD media of an updated Draft Hazardous Materials Area <br />Plan for comment. <br />• Provide the SAFD with hardcopy and CD media of a completed final draft Hazardous MSaterials <br />Area Plan in conformance with California Health and Safety Code Chapter 6.95, Section 25503(c) <br />and Cal EMA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.