My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-27
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2002
>
2002-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:56:02 PM
Creation date
12/17/2010 9:23:13 AM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
VA02-08
Date
9/23/2002
Notes
1729 E Dyer Rd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Conditions for Approval for Variance No. 2002-08 <br />Variance 02-08 is approved subject to compliance, to the reasonable satisfaction of the <br />Planning Manager, with all applicable sections of the Santa Ana Municipal Code, the <br />California Administrative Code, the Uniform Fire Code, the Uniform Building Code and all <br />other applicable regulations. <br />The applicant must comply in full with each and every condition listed below rip or to <br />exercising the rights conferred by this variance. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the variance. Failure to comply with each and every condition may result in the <br />revocation of the variance. <br />A. Planning Division <br />1. The project shall remain in compliance with Site Plan Review DP No. <br />01-84. <br />B. Mitigation Measures <br />2. All materials excavated or graded will be sufficiently watered to <br />• prevent excessive amount of dust. Watering with complete coverage <br />shall occur at least twice daily, once in the late morning and once <br />after work is done for the day. <br />3. All clearing and earthwork activities shall cease during period of high <br />winds (winds greater than 25 mph averaged over one hour) or during <br />Stage 1 or Stage 2 smog episodes. <br />4. Streets surrounding the project site should be cleaned at the end of <br />each day of construction. <br />5. All materials transported offsite shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. <br />6. The amount of area disturbed by clearing and earthwork activities <br />shall be minimized at all times. <br />7. To the extent feasible, equipment engines shall be maintained in <br />good condition and in proper tune according to manufacturer's <br />specifications. <br />8. To the extent feasible, gasoline powered equipment shall be used for <br />onsite and offsite construction activities. <br />• <br />EXHIBIT "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.