My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-61
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2001
>
2001-61
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:56:20 PM
Creation date
12/17/2010 10:07:31 AM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
TPM01-05
Date
12/12/2001
Notes
1 & 2 E MacArthur Pl
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions for Approval <br />Should Tentative Parcel Map No. 01-05 be approved, the project shall comply with all <br />applicable sections of the Santa Ana Municipal Code, the California Administrative Code, <br />the Uniform Fire Code, the Uniform Building Code and all other applicable regulations. <br />The applicant .must comply in full with each and every- condition listed below rip or to <br />exercising the rights conferred by this parcel map. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the parcel map. Failure to comply with each and every condition may result in the <br />revocation of the parcel map. <br />A. Planning Division <br />1. The Final Map is required to be recorded within two years of the date of <br />approval of the tentative map by the City Council. <br />2. Two copies of the recorded Final .Map need to be submitted each to the <br />Planning Division and Public Works Agency within 10 days of recordation. <br />3. -All development within the area of the. map is subject to development and <br />permit fees in effect at the time of permit issuance. <br />• 4. All development within the area of the map is subject to all design and <br />development standards in effect at the time of permit issuance. <br />5. The tentative map, final map, and all improvements required to be made or <br />installed by the subdivider will be in accordance with the design standards <br />and specifications of the Santa Ana Municipal Code and the requirements <br />of the State Subdivision Map Act. <br />6. Conditions, Covenants and Restrictions (CC&R's) will need to be recorded <br />in conjunction with the recordation of the Final Map. The CC&R's will need <br />to include provisions for shared parking, access and egress, landscaping <br />and site maintenance. <br />7. All proposed site improvements must conform to the Site Plan Review <br />approval of DP No. 01-45. <br />B. Public Works Agency <br />Prior to recording the Final Map, complete the following: <br />1. File, process and record amended and/or new Covenants, Conditions and <br />Restrictions (CC&R's) over the two parcels. The CC&R's need to address <br />issues including ingress and egress, cross lot drainage, utilities, parking, <br />• emergency vehicle access, common area maintenance, irrigation and <br />landscaping. <br />EXHIBIT "A" <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.