My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-38
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2001
>
2001-38
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:56:15 PM
Creation date
12/17/2010 10:40:34 AM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
SPR01-05
Date
8/13/2001
Notes
200 N Cabrillo Park Dr
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CGN: 8/2/01 <br />• EXHIBIT "A" <br />CONDITIONS OF APPROVAL FOR SITE PLAN REVIEW NO. 2001-05 <br />Site Plan Review No. 01-05 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the Uniform Fire Code, the Uniform <br />Building Code, and all other applicable regulations. In addition, it shall meet the <br />following conditions of approval: <br />The applicant must comply with each and every condition listed below rip or to exercising <br />the rights conferred by this site plan review. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the development project. Failure to comply with each and every condition may <br />result in the revocation of the site plan review approval. <br />A. Planning Division <br />1. The project must remain in compliance with the projects Site Plan Review <br />comments (DP No. 01-12). <br />2. Any amendment to the project must be submitted to the Planning Division <br />• for review. If it is determined that the amendment constitutes a significant <br />change to the project, the item must be submitted to the Planning <br />Commission for review. <br />Mitigation Measures <br />3. To ensure an acceptable noise environment adjacent to the project site, <br />construction activities shall be limited to the hours of 7:00 a.m. to 7:00 <br />p.m., Monday through Saturday. In addition, construction traffic should <br />be routed away from residential areas. <br />4. Control fugitive dust by regular watering, paring construction roads, or <br />other dust palliative measures per the requirements of SCAQMD. <br />5. Phase and schedule construction activities to level emission peaks. <br />6. Maintain equipment engines in proper tune.. <br />7. Discontinue construction during first and second stage smog alerts. <br />8. Encourage the use of alternate transportation modes by promoting <br />public transit usage and providing secure bicycle facilities and <br />
The URL can be used to link to this page
Your browser does not support the video tag.