Laserfiche WebLink
11. Prior to turning on water meters and/or fire services the proposed project <br />shall arrange for installation, testing, and certification of all needed <br />backflow protection devices. <br />12. As part of the development for 2 Hutton Centre, the project applicant <br />shall dedicate 12' of frontage on northbound Hutton Centre Drive <br />between Hutton Centre Loop road and MacArthur Boulevard prior to the <br />issuance of building permits. <br />13. Prior to issuance of building permits for the 10 Hutton Centre <br />development, the project applicant shall construct the northbound <br />approach of Hutton Centre Drive between Hutton Centre Loop Road and <br />MacArthur Boulevard. The project shall also relocate traffic signal at <br />MacArthur and Hutton Centre. <br />14. Prior to issuance of building permit for the 10 Hutton Centre <br />development, the project applicant shall dedicate land for street <br />widening along Main Street south of MacArthur Boulevard. The City of <br />Santa Ana shall construct the northbound right-turn lane, the signal <br />modifications, as well as other improvements at the Main <br />Street/MacArthur Boulevard intersection. <br />15. Prior to issuance of first permit associated with change in land use for 9 <br />• Hutton Centre, the project applicant shall dedicate land for street <br />widening on eastbound MacArthur Boulevard (south side) along the 1 <br />Hutton Centre site. If development of the 1 Hutton Centre site precedes <br />redevelopment of the 9 Hutton Centre site, the project applicant for 1 <br />Hutton Centre shall be required to dedicate the land needed for street <br />widening (1 Hutton Centre fronts on Mac Arthur between main Street <br />and Hutton Centre Drive), and will be required to construct the <br />improvements along the entire 1 Hutton Centre frontage. <br />16. Prior to issuance of building permit for first building to be developed <br />within 1 Hutton Centre, the project applicant shall dedicate land for street <br />widening on eastbound MacArthur (south side) along Site 1 frontage <br />between Main Street and the westerly property line of 9 Hutton Centre. <br />The project applicant shall also construct improvements from Main <br />Street to Hutton Centre Drive. <br />17. As part of the development of 1 Hutton Centre, the project applicant <br />shall construct curb and driveway on the south side of MacArthur <br />Boulevard, between Main Street and Hutton Centre Drive. <br />18. Recycling bins for glass, metals, paper, wood, plastic, green waste and <br />cardboard shall be placed on the construction sites for use by <br />• construction workers. <br />