My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-65
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2000
>
2000-65
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:56:28 PM
Creation date
12/30/2010 1:42:29 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
ER99-83VA0016ME
Date
12/11/2000
Notes
4300 Westminster Av
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• EXHIBIT A <br />VARIANCE NO.00-16 <br />DECEMBER 11, 2000 <br />PAGE2OF3 <br />7. Grading plans for the proposed project shall reflect that during demolishing, <br />earthwork, and hauling activities, the contractor shall control fugitive dust <br />emissions by regular watering or other dust-preventive measures to the <br />extent feasible to comply with SCAQNID Rule 403, such measures would <br />include: <br />a. All material excavated or graded will be sufficiently watered to <br />prevent excessive amounts of dust. Watering with complete <br />coverage shall occur at least twice daily, once in the late morning <br />and once after work is done for the day. <br />b. All clearing and earthwork activities shall cease during period of <br />high winds (winds greater than 25 mph averaged over one hour) or <br />during Stage 1 or Stage 2 smog episodes. <br />c. Streets surrounding the project site should be cleaned at the end of <br />• each day of construction. <br />d. All material transported offsite shall either be sufficiently watered <br />or securely covered to prevent excessive amounts of dust. <br />e. The amount of area disturbed by clearing and earthwork activities <br />shall be minimized at all times. <br />f. To the extent feasible, equipment engines shall be maintained in <br />good condition and in proper tune according to manufacturer's <br />specifications. <br />g. To the extent feasible, gasoline powered equipment shall be used <br />for onsite and offsite construction activities. <br />8. In the event unknown archaeological resources or unknown human <br />remains are discovered during construction activities, all construction <br />activity within the area of the finding shall halt and the City's <br />Environmental Coordinator shall be contacted for appropriate action. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.