~~OLUTION NO.00-52
<br />III~NOVEMBER 27, 2000, 2000
<br />PAGE 5 OF 8
<br />y. Prior to issuance of building permits, the applicant
<br />shall prepare an acoustical analysis report, prepared
<br />under the supervision of a person experienced in the
<br />field of acoustical engineering. The report shall show
<br />topographical relationship of noise sources and dwelling
<br />site, identification of noise sources and their
<br />characteristics, predicted noise spectra at the exterior
<br />of the proposed dwelling structure considering present
<br />and future land usage basis for the prediction, noise
<br />attenuation measures to be applied, and an analysis of
<br />the noise insulation effectiveness of the proposed
<br />construction showing that the prescribed interior noise
<br />level requirements are met. If interior allowable noise
<br />levels are met by requiring that windows be unopened or
<br />closed, the design for the structure must also specify
<br />the means that will be employed to provide ventilation
<br />and cooling if necessary, to provide a habitable interior
<br />environment.
<br />• If otential noise roblems do arise from sweeping
<br />z. p P
<br />operations in the parking lot, sweeping should be limited
<br />to daytime hours between 7 a.m. and 8 p.m.
<br />aa. G~'ad,~?-fig end ~~~~,~3,~r~g ;F~~l~~ ~4~', t~~ ~p,~F~~~,~~.~,'~~'„ h~~~~i,~~`~~'
<br />specify '~~,at~~~ ~Q~~truQ~~~,oz~'.. ~~t'ivit~,~~ ; ~~~~ ~ ; , •'~', ~1 ,,,~~;'~,~
<br />the ~' ~'1lG~ur,~' p;f '~'~43Q' ~~~zn, ~4~~ ~ ± Q~' ~;~,,.,~. h,`,i!~ ~ 4~~1~~
<br />~t ~~;, ~ ~~~ _..
<br />~~~~!~~~~~~;;~~,~p.~,s -q~, a,p~~~h~',, (Modified by the Planning
<br />Commission November 27, 2000).
<br />bb. Grading and Building Plans for the proposed project shall
<br />specify that construction activities shall be limited to
<br />the hours of 7:00 a.m. to 8:00 p.m. Monday through
<br />Friday, 8:00 a.m. to 8:00 p.m. on Saturday, and not
<br />permitted on Sundays or federal holidays.
<br />cc. Built-in fire protection shall be provided in individual
<br />buildings whenever the circulated fire flow exceeds 3,500
<br />GPM. Buildings with a fire flow in excess of 5,500 GPM
<br />• are prohibited.
<br />
|