My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-51
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2000
>
2000-51
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:56:27 PM
Creation date
12/30/2010 1:56:19 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
va0015cup00026
Date
11/12/7200
Notes
Imperial & MacArthur Blvd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OLUTION NO.00-51 <br />ECEMBER 4, 2000 <br />PAGE 1 OF 6 <br />Conditions of Approval <br />Variance No. 00-15 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with applicable sections of the <br />Santa Ana Municipal Code, the California Administrative Code, the Uniform <br />Fire Code, the Uniform Building Code, and all other applicable <br />regulations. In addition, it shall meet the following conditions of <br />approval. <br />The applicant must comply with each and every condition listed below prior <br />to exercising the rights conferred by this variance. The applicant must <br />remain in compliance with all conditions listed below throughout the life <br />of the development project. Failure to comply with each and every <br />condition may result in the revocation of the site plan review approval. <br />A. Planning Division <br />1. All proposed site improvements must conform with the Site Plan <br />• Review approval of DP No. 00-52. <br />2. Any amendment to this variance must be submitted to the <br />Planning Division for review. At that time, staff will <br />determine if administrative relief is available or the <br />conditional use permit must be amended. <br />3. The lower and first floor levels of the hotel <br />stone or a similar stone like material as the <br />This material must be submitted to and be <br />Planning Division. <br />4. A Parking Management Plan documenting how tr <br />stalls will function must be submitted prior <br />check. <br />must incorporate <br />exterior finish. <br />approved by the <br />ie tandem parking <br />to building plan <br />5. Covenants, Conditions, and Restrictions (CC&R's) that restrict <br />truck delivery hours to non-peak periods need to be submitted <br />prior to building plan check. <br />6. The project must comply with the mitigation measures <br />identified in Final Environmental Impact Report No. 87-1. <br />• These mitigation measures include: <br />ATTACHMENT B <br />
The URL can be used to link to this page
Your browser does not support the video tag.