Laserfiche WebLink
OLUTION NO. 00-51 <br />ECEMBER 4, 2000 <br />PAGE 4 OF 6 <br />.S . Ai„ l~ 1~1"gqT,T"~ i "~„I' ±1}.4~R~W C~ I ~ ~ ., ~4rtI r.. ,~ I }}~ky~y~,~{~ I~hhI, J r-ia i' ~~ 11 ~ +~~II ~1~~5i~~(i, <br />~~.5'~~ti?: ~ w~,~~ I ~i!R~"~ 1 ~IM~I~~~.. ,~~ ~ ~~'i I~; ~N ~ h ll~ ~r U':"" <br />~~`~~1 a~j 'j yy,,~~ y~y ~ L i h~~i,~ {r~' ~yI <br />~.o~~.~; 'L'~~~ ~1$V~xo~~r ~~ °t;~7j^I"~"~~ ~"~if~~~p°~'k!~ ~~ ~ ~~, "~11^", i~~,f~ ,~i!!ri+fr~~~rh~~' <br />pe~m~,~~ ~ca~ ~~,,p4~5?~~~;~~;~;s~~~~,~Ca.~:~~'"~ ~_` , ~~~g''~I; (Modified by <br />the Planning Commission November 27, 2000). <br />t. Prior to the issuance of a building permit, the applicant <br />shall submit for review and approval an Erosion Control <br />Plan. <br />u. Prior to issuance of building permits, the applicant <br />shall coordinate with the FAA on the height and location <br />of the proposed hotel building. <br />v. Prior to the issuance of building permits, the project <br />applicant shall provide a NPDES post construction storm <br />water management plan per Orange County Drainage Area <br />• Management Plan to include all Structural and Non- <br />Structural Best Management Practices for the proposed <br />project. <br />w. Prior to the issuance of building permits, the applicant <br />shall submit for review and approval a surface drainage <br />plan prepared by registered Civil Engineer, showing the <br />direction and means of flow to adjacent streets. The <br />plan is to include existing and proposed elevations at <br />and adjacent to all property lines. Drainage routed to <br />the street must be directed beneath the sidewalk and <br />through the curb. <br />x. The proposed project shall comply with the State of <br />California Noise Insulation Standards. The code requires <br />that interior community noise levels with windows closed, <br />attributable to exterior sources shall not exceed a 45 dB <br />CNEL in any habitable room. <br />y. Prior to issuance of building permits, the applicant <br />shall prepare an acoustical analysis report, prepared <br />under the supervision of a person experienced in the <br />• field of acoustical engineering. The report shall show <br />topographical relationship of noise sources and dwelling <br />site, identification of noise sources and their <br />