My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - SANTA ANA BLVD GRADE SEPARATION_Exhibit A-1_Color
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/18/2011
>
25B - SANTA ANA BLVD GRADE SEPARATION_Exhibit A-1_Color
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:44:35 PM
Creation date
1/3/2011 11:41:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECO M <br />prepared will identify and document anticipated impact <br />to paleontological resources existing with the project's <br />limits of disturbance (both vertical and horizontal), if <br />potential impacts exist. <br />ICF Jones & Stokes shall prepare a PIR /PER that <br />includes the following: <br />• Summary of the proposed project <br />• Delineation of the project limits <br />• Delineation of the project excavation locations and <br />depths <br />• Document efforts to avoid or minimize effects on <br />paleontological resources <br />• Identify significance and /or sensitivity of <br />paleontological resources and /or rock units <br />following the guidance provided at: <br />http: / /www.dot.ca.gov /ser /volt /sec3 /physical /Ch0 <br />8Paleo /chap08paleo.htm #pir <br />• Identification of sources consulted and results of <br />that consultation <br />• Identification of any consultation related <br />constraints <br />• Identification of a course of action, including <br />identification of specific geologic formations and <br />paleontological resources <br />• Identification of the persons preparing the PIR /PER <br />and their qualifications <br />• Identify whether a Paleontological Mitigation Plan <br />(PMP) is recommended <br />It is assumed that a PMP will not be recommended or <br />required for the proposed project and one is not <br />included in this scope and cost. It is further assumed <br />that the findings of the PIR /PER will be negative and no <br />additional paleontological tasks or effort will be <br />req u i red. <br />Based upon the last three road /rail grade separation <br />projects that ICF Jones & Stokes has performed in <br />southern California an air quality report may not be <br />required for the project. It has been determined on <br />these other three projects that as long as the project <br />does not add additional capacity or include the <br />installation of new stop signs or traffic signals that an <br />Air Quality Report is not required. However, an Air <br />Quality Report has been included in this scope and cost <br />in case it is ultimately determined to be required by the <br />District. This will be discussed early in the process with <br />Caltrans and further document in the PES that is <br />prepared. <br />ICF Jones & Stokes will prepare an air quality technical <br />report that analyzes air pollutant emissions associated <br />with changes in vehicle speed and traffic distribution <br />patterns resulting from the proposed project. All impact <br />analyses will be performed consistent with the <br />technical requirements and methodologies outlined in <br />the Caltrans' Standard Environmental Reference (air <br />quality chapter). <br />The air quality technical report will provide the following <br />discussions and analyses: <br />Regulatory Setting and Existing Conditions. <br />Summarize the existing federal, state, and local air <br />quality regulatory environment as it affects the <br />proposed project, and describe the location of sensitive <br />receptors in the project vicinity. Using data provided by <br />the California Air Resources Board (CARB) and the <br />SCAQMD, characterize existing air quality conditions in <br />the project area and explain how those conditions are <br />affected by local climate and topography. <br />Evaluation of Construction Emissions. Based on <br />current District 12 procedure, provide a qualitative <br />discussion related to construction emissions. <br />Evaluation of Operations- Period Mass Emissions. <br />Evaluate whether the project meets transportation <br />conformity requirements by determining whether it is <br />included, as currently defined, in the most recent <br />Regional Transportation Plan (RTP) and Regional <br />Transportation Improvement Program (RTIP) prepared <br />by the Southern California Association of Governments <br />(SCAG). It is assumed that the projects will be included <br />in the RTIP and that a regional analysis will not be <br />req u i red. <br />Localized Carbon Monoxide Hot SpotAnalysis. <br />Analyze the degree to which project- related traffic <br />volumes have a potential to effect local carbon <br />monoxide (CO) concentrations using the California <br />Department of Transportation CO Hotspot Protocol. It is <br />anticipated that the CO screening procedure will be <br />appropriate. However, it is assumed, based on <br />experience within the District that CALINE -4 dispersion <br />modeling will also be performed. It is assumed that up <br />to two intersections will be modeled. <br />Localized PM2.5 1PM10 Hot Spot Analysis. Analyze <br />the degree to which project- related traffic volumes have <br />a potential to affect local PM2.5 and PM10 <br />concentrations, based on the United States <br />Environmental Protection Agency (EPA) guidance <br />document entitled Transportation Conformity Guidance <br />for Qualitative Hot -spot Analyses in PM2.5 and PM10 <br />Nonattainment and Maintenance Areas. This scope and <br />cost assumes that a screening level analysis is <br />appropriate, and that no modeling will be required by <br />Caltrans or FHWAto address PM2.5 and PM10. <br />Mobile Source Air Toxics. Evaluate proposed project - <br />related mobile source air toxics (MSATs) emissions in <br />accordance with FHWA interim guidance on how MSATs <br />should be addressed in NEPA documents. It is not <br />assumed that extensive qualitative analyses would be <br />required to address MSATs. If an extensive quantitative <br />analysis is required for the project, then a scope and <br />cost estimate would be provided for this additional <br />effort, however, such an analysis is not anticipated. <br />.g <br />._r Proposal for Project Study Report Equivalent and Conceptual Engineering Plans for <br />Santa Ana Boulevard Grade Separation Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.