My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-01-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
FULL PACKET_2011-01-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:20 PM
Creation date
1/4/2011 12:28:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
546
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> ATTACHMENT 1 <br /> <br /> <br /> SPECIFICATIONS AND REQUIREMENTS FOR STEAM CLEANING AND PRESSURE <br /> WASHING AT THE SARTC <br /> <br /> <br /> 1.1 Contractor shall supply all labor, materials, equipment and transportation necessary for the <br /> removal of stains and deposits from cement and brick paver sidewalks as indicated on the <br /> attached map (Attachment F) of the SARTC. <br /> <br /> 1.2 All work at the SARTC shall be performed between the hours of 11 pm and 5am, excluding <br /> Friday and Saturday. <br /> <br /> 1.3 The areas are described below: <br /> <br /> Four Levels of Parking Structure Annually <br /> (all floors, ledges, landings, walls, & pipes) <br /> Walkway to Santa Ana Boulevard Semi-Annually <br /> Flag Area Semi-Annually <br /> Concrete Drive Area from Fountain to Flags Semi-Annually <br /> <br /> Parking Structure - North & South Stairways and <br /> Elevator entrance areas Quarterly <br /> Parking Structure - Entry and Exit areas (booths, etc.) Quarterly <br /> Parking Structure - Main Entrance Area to <br /> Greyhound area Quarterly <br /> North Esplanade Quarterly <br /> Northbound Platform Quarterly <br /> Southbound Platform Quarterly <br /> Courtyard Stairways to Second Level Quarterly <br /> Pedestrian Bridge from Parking Structure to Quarterly <br /> 2"d floor of building <br /> Pedestrian Bridge over tracks and stairways Quarterly <br /> Walkways from Courtyard to south Quarterly <br /> driveway and trash area <br /> Bus bays 1-10 Monthly <br /> Main Entrance Monthly <br /> Fountain and surrounding area Monthly <br /> Courtyard Monthly <br /> South Esplanade Monthly <br /> West Esplanade Monthly <br /> East Esplanade Monthly <br /> Landing area inside 1" floor of Parking Structure Monthly <br /> Landing area inside 2"d floor of Parking Structure Monthly <br /> Landing area inside 3rd floor of Parking Structure Monthly <br /> All lower walls and columns/pillars with brick material in the areas described above are to be <br /> included in the work performed. <br /> 25E-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.