My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-01-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
FULL PACKET_2011-01-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:20 PM
Creation date
1/4/2011 12:28:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
546
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> CUP NO. 2010-23 <br /> DECEMBER 13, 2010 <br /> PAGE 3 OF 4 <br /> <br /> <br /> 8. The permit applicant recognizes that the frequencies used by the cellular <br /> facility located at 620 West Warner Avenue are extremely close to the <br /> frequencies used by the City of Santa Ana for Public Safety. This proximity <br /> will require extraordinary "comprehensive advanced planning and frequency <br /> coordination" engineering measures to prevent interference, especially in <br /> the choice of frequencies and radio ancillary hardware. This is encouraged <br /> in the "Best Practices Guide" published by the Association of Public-Safety <br /> Communications Officials-International, Incorporated (APCO), and as <br /> endorsed by the Federal Communications Commission (FCC). Prior to the <br /> issuance of any permits to install the facility, (permit applicant) shall meet in <br /> good faith to coordinate the use of frequencies and equipment with the <br /> Communications Division of the Orange County Sheriff-Coroner <br /> Department to minimize, to the greatest extent possible, any interference <br /> with the Public Safety 800 MHz Countywide Coordinated Communications <br /> System (CCCS). Similar consideration shall be given to any other existing <br /> or proposed wireless communications facility that may be located on the <br /> subject property. <br /> 9. At all times, the permit applicant shall not prevent the City of Santa Ana <br /> from having adequate spectrum capacity on the City's 800 MHz radio <br /> frequency. <br /> 10. Before activating its facility, the permit applicant will submit to a post- <br /> installation test to confirm that "advanced planning and frequency <br /> coordination" of the facility was successful in not interfering with the City of <br /> Santa Ana Public Safety radio equipment. This test will be conducted by <br /> the Communications Division of the Orange County Sheriff-Coroner <br /> Department or a Division-approved contractor at the expense of the <br /> applicant. This post-installation testing process shall be repeated for every <br /> proposed frequency addition and/or change to confirm the intent of the <br /> "frequency planning" process has been met. <br /> 11. The permit applicant shall provide a 24-hour phone number to which <br /> interference problems may be reported. This condition will also apply to all <br /> existing facilities in the City of Santa Ana. <br /> 12. The permit applicant will provide a "single point of contact" in its <br /> Engineering and Maintenance Departments to insure continuity on all <br /> interference issues. The name, telephone number, fax number and e-mail <br /> address of that person shall be provided to the City's designated <br /> representative upon activation of the facility. <br /> <br /> <br /> <br /> <br /> Resolution No. 2010-19 <br /> Page 6 of 7 <br /> 31 A-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.