My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BANNAOUN ENGINEERS CONSTRUCTORS CORP. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
BANNAOUN ENGINEERS CONSTRUCTORS CORP. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:55:43 PM
Creation date
1/12/2011 4:11:00 PM
Metadata
Fields
Template:
Contracts
Company Name
BANNAOUN ENGINEERS CONSTRUCTORS CORP.
Contract #
11-6735
Agency
Public Works
Council Approval Date
1/4/2011
Destruction Year
2016
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />• PROJECT NO. 116735: FIRST STREET FROM GRAND AVE. TO I -5 <br />PROPOSAL & CONTRACT AGREEMENT <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: <br />REQUIREMENT: <br />The undersigned declares that he /she has carefully examined the location of the proposed work, that <br />he /she has examined the Plans and Specifications and read the accompanying instruction to <br />BIDDERS, and hereby proposes to furnish all material and do all the work required to complete the <br />said work in accordance with said plans (if any), specifications and special provisions, for the unit <br />price(s) or lump sum(s) set forth in the following schedule: <br />Item # <br />Bid Item <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />1. <br />Unclassified Excavation <br />CY <br />2,400 <br />0 <br />$ 4& s <br />$ 116,400' <br />2. <br />• <br />AC Pavement <br />TN <br />5,410 <br />$ 65 pis <br />$ 3 5 64 78`?6�O <br />3. <br />Asphalt Rubber Hot Mix (ARHM) <br />TN <br />2,980 <br />7s <br />$-78— <br />o0 <br />$ a34,, 6 75 " <br />4. <br />Cold Mill 2 " -3" <br />SF <br />150,700 <br />re <br />$ O "' <br />�_ <br />$ a7, /a6 <br />5. <br />Cold Mill 5 %" up to PCC pavement <br />SF <br />44,000 <br />30 <br />ob <br />$ /3, a CO <br />6. <br />Pavement Fabric <br />SY <br />26,420 <br />$ is <br />_� <br />oe <br />$30,,38-3 <br />7. <br />PCC Bus Pad <br />SF <br />930 <br />0 <br />$ g s <br />$ 7, 9 0577" <br />8. <br />Reconstruc Median Nose <br />EA <br />2 <br />� <br />$1000 <br />eo <br />$ <br />9. <br />PCC Curb and Gutter <br />LF <br />1,430 <br />$ R-5 s� <br />$ 3 3, 60S �^ <br />10. <br />PCC Sidewalk (T =4 ") <br />SF <br />2,670 <br />$ 4 ro <br />$ !04 6147 <br />11. <br />PCC Curb Ramp <br />SF <br />2,590 <br />$ S sa <br />$ X46 — <br />12. <br />PCC Driveway Approach (T =8 ") <br />SF <br />4,790' <br />13. <br />PCC Cross Gutter <br />SF <br />990 <br />ee <br />$ $ ^' <br />e e <br />$ 7,7.,7o -' <br />• 14. <br />Root Shave Tree <br />EA <br />1 <br />$ 350- <br />$ 3 S-O <br />BP 1 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.