My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - CABLE EQUIPMENT MAINT AND VIDEO PRODUCTION SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/18/2011
>
25A - CABLE EQUIPMENT MAINT AND VIDEO PRODUCTION SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:53:59 PM
Creation date
1/13/2011 1:01:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25A
Date
1/18/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br />VIDEO ENGINEERING SERVICES <br />(February 1, 2011 -January 31, 2012) <br />BASE ENGINEER <br />1. Consultant shall confer with the Executive Director of Parks, Recreation and Community Services <br />or assigned staff to evaluate needs and supervise maintenance activity of all city owned <br />audio/video facilities. Includes City Hall, recreation centers, senior centers, Stadium, soccer <br />fields, etc. <br />2. Review and make recommendation for the repair and /or replacement of said audio/video <br />facilities. <br />3. Design layout of electrical circuitry for existing and /or acquired audio /video equipment <br />4. Ensure compliance with local, state, and federal safety codes and regulations. <br />5. Establish and maintain equipment log and data base to keep inventory and records of maintenance <br />and to track equipment performance. <br />6. Help establish and enforce Agency wide policies for equipment use. Provide operation <br />instruction for staff. <br />7. Conduct regular security checks on the City's production equipment. <br />8. Prepare preventative maintenance schedules and execute said maintenance on a routine basis. <br />9. Supervise annual asset inventories and tagging of new assets, as needed. <br />10. Coordinate equipment repair with outside agencies. <br />11. Coordinate acquisition of new production equipment. <br />12. Facilitate and supervise use of facilities or equipment by outside agencies, persons, other City <br />employees or cable franchisee staff. <br />13. Facilitate completion of production services requested by City staff (including making dubs, <br />editing and shooting videos, setting up equipment, delivering equipment, setting up operating <br />facilities as needed.) <br />14. Provide updates to Executive Director and/or assigned staff on progress of equipment install, <br />maintenance, building projects and anticipated completion dates. <br />15. Assist City Clerk and other staff on use of Council Chambers: video, audio, lighting, power <br />point, elmo or other technical needs. <br />COMPENSATION Annually $15,015 <br />City will pay contractor $55 (fifty five) per hour. For an average of 10.5 hours every two weeks per <br />week. The first and third Mondays of the month (Council Meetings) shall be two regularly assigned <br />workdays for Contractor. <br />25A-5
The URL can be used to link to this page
Your browser does not support the video tag.