My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:45:51 PM
Creation date
1/13/2011 3:55:04 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Contract #
N-2011-004
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0824 <br />EXHIBIT A <br />3.3.3 TASK C-3: WESTMINSTER/17TH STREET BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES - COMPLETED DATA COLLECTION .................54 <br />3.3.4 TASK C-4: WESTMINSTER/17TH STREET BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES - COMPLETED INVENTORY OF EXISTING <br />TRAFFIC SIGNALS, FIELD MASTERS/HUBS LOCATIONS, SIGNAL <br />COMMUNICATIONS, AND TRAFFIC MANAGEMENT SYSTEMS .................56 <br />3.3.5 TASK C-5: WESTMINSTER/17TH STREET BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES - COMPLETED WESTMINSTER/17TH STREET <br />BRT CORRIDOR "BEFORE" STUDY..............................................................58 <br />3.3.6 TASK C-6: WESTMINISTER/17TH STREET BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES - COMPLETED DESIGN PHASE <br />DOCUMENTATION REVIEW..........................................................................59 <br />3.3.7 TASK C-7: WESTMINSTER/17TH STREET BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES - SIGNAL TIMING OPTIMIZATION .....................60 <br />3.3.8 TASK C-8: WESTMINSTER/17TH STREET BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES - PROJECT COORDINATION AND MEETINGS.63 <br />SECTION 4.0 TRAFFIC SIGNAL SYNCHRONIZATION IMPLEMENTATION ............ 66 <br />4.1 TASK AND DELIVERABLE REQUIREMENTS................................................66 <br />4.2 PART "A" - BRISTOL/STATE COLLEGE BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES......................................................................66 <br />4.2.1 TASK A-1: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS SERVICES - <br />SIGNAL TIMING IMPLEMENTATION..............................................................66 <br />4.2.2 TASK A-2: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES - EQUIPMENT PROCUREMENT................69 <br />4.2.3 TASK A-3: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES - EQUIPMENT INSTALLATION <br />SCHEDULINGOF WORK................................................................................70 <br />4.2.4 TASK A-4: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES - EQUIPMENT INSTALLATION <br />COORDINATION, INSTALLATION MANPOWER, AND INSTALLATION <br />RESTRICTIONS..............................................................................................70 <br />4.2.5 TASK A-5: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES - EQUIPMENT INSTALLATION GUARANTEE <br />......................................................................................................................... 72 <br />4.2.6 TASK A-6: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES - "AFTER STUDY"........................................72 <br />4.2.7 TASK A-7: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES - PROJECT REPORT...................................73 <br />Scope of Work 4 09/09/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.