My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:45:24 PM
Creation date
1/14/2011 8:20:49 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Contract #
N-2011-006
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING C-9-0826 <br />1 one of the three (3) corridors for Traffic Signal Synchronization Projects for Orange County; and <br />2 WHEREAS, the PROJECT is nineteen (19) miles in length and will include approximately <br />ninety-seven (97) traffic signals located from the City of Brea to the City of Costa Mesa, as illustrated in <br />4 the PROJECT Scope of Work which is attached herein as Exhibit A; and <br />5 WHEREAS, the PROJECT will also include hardware and software upgrades to traffic <br />f controllers, traffic telecommunications and inter -tie systems, central traffic master controllers and <br />i associated systems (hereinafter collectively referred to as "Traffic Control Elements"), and these Traffic <br />3 Control Elements will be constructed and/or installed and implemented as part of the PROJECT as <br />identified in the PROJECT Scope of Work; and <br />10 WHEREAS, AUTHORITY agrees to work with AGENCIES to coordinate the inclusion of other <br />1 1 Traffic Control Elements to be installed during the construction of the PROJECT that are not included in <br />12 the PROJECT Scope of Work, and that the owning AGENCY will have responsibility for coordinating <br />13 and funding the installation of those Traffic Control Elements during the course of the PROJECT; and <br />14 WHEREAS, AUTHORITY and AGENCIES desire to enter into this MOU to demonstrate their <br />15 commitment to improving transportation opportunities for Orange County and to develop and implement <br />16 the Bristol Street/State College Boulevard TSS Project; <br />17- NOW, THEREFORE, it is mutually understood and agreed by AUTHORITY and AGENCIES to <br />18 enter into the following Memorandum of Understanding with respect to the matters as follows: <br />1 ARTICLE 1. COMPLETE AGREEMENT: <br />2Q This MOU, including all exhibits and documents incorporated herein and made applicable by <br />21: reference, constitutes the complete and exclusive statement of the terms and conditions of the MOU <br />22 between AUTHORITY and AGENCIES concerning the PROJECT and supersedes all prior <br />23 representations, understandings and communications between the parties. The above -referenced <br />24 recitals are true and correct and are incorporated by reference herein. The invalidity in whole or part of <br />2`3 any term or condition of this MOU shall not affect the validity of other term(s) or condition(s). <br />26 / <br />Page 2 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.