My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:45:24 PM
Creation date
1/14/2011 8:20:49 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Contract #
N-2011-006
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0826 <br />EXHIBIT A <br />Previous consultant prepared a "Before" Study Project Report and finalized the <br />"Before" Study Project Report based on comments received from the <br />AUTHORITY. <br />AUTHORITY shall provide an electronic copy, in MS Word, MS Excel, and <br />Adobe Acrobat (PDF) format, of the completed and AUTHORITY approved <br />Harbor Boulevard BRT Corridor "Before" Study Project Report for CONSULTANT <br />review and background information. <br />CONSULTANT shall provide a section in the technical memorandum deliverable, <br />as described in Section 3.2.6 to AUTHORITY detailing the findings of the <br />completed "Before" Study Project Report review. <br />3.2.6 TASK B-6: HARBOR BOULEVARD BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES — COMPLETED DESIGN PHASE <br />DOCUMENTATION REVIEW <br />CONSULTANT shall review all completed design phase documentation by others <br />listed above in Sections 3.2.2 through 3.2.5 and below in Section 3.2.7. <br />CONSULTANT shall prepare a technical memorandum detailing findings of the <br />design phase documentation review. The report shall contain, but not be limited <br />to, the following: <br />a. Review Findings <br />b. Deficiencies <br />c. Changes of Existing Field Conditions (lane configuration, signal phasing, <br />etc.) <br />d. Missing Information / Incomplete Information <br />e. Information required to update the completed design phase <br />documentation by others <br />f. Recommendations Required to Complete the Remaining TSS Design <br />Finalization Tasks <br />The report shall be provided in sections in accordance to each design phase <br />document reviewed. <br />Harbor Boulevard BRT Corridor TSS Design Finalization Services deliverables <br />(in part to include): <br />B6a. Technical memorandum detailing findings of the completed design phase <br />documentation review. <br />3.2.7 TASK B-7: HARBOR BOULEVARD BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES — SIGNAL TIMING OPTIMIZATION <br />Scope of Work 48 05/18/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.