Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />SECTION 5.0 SUPPORT SERVICES <br />5.1 PART "A" -BRISTOL/STATE COLLEGE BRT CORRIDOR TSS SUPPORT <br />SERVICES <br />5.1 .1 TASK A-1 : BRISTOL/STATE COLLEGE BRT CORRIDOR TSS SIGNAL <br />TIMING SUPPORT SERVICES <br />CONSULTANT shall provide continuing signal timing support to monitor, <br />observe, fine-tune, and optimize the signal timing and phasing operations of the <br />synchronized signalized intersections (as implemented as part of the SOW) <br />along the Bristol/State College BRT Corridor. The signal timing support services <br />shall last for a period of nine (9) months after written acceptance from <br />AUTHORITY is provided for the implementation of the signal timing along the <br />Bristol/State College BRT Corridor. The frequency of the signal timing support <br />services shall be at a rate of once per month for the initial three (3) months and <br />once every two months for the remaining six (6) months. <br />During each of the six (6) required support periods, CONSULTANT shall monitor <br />the Bristol/State College BRT Corridor via the Traffic Management System <br />(TMS) software (if applicable), and perform field surveys of the Bristol/State <br />College BRT Corridor to observe the traffic patterns, recommend fine-tuning, <br />and, if approved by AUTHORTY in writing, fine tune the signal timing based upon <br />the surveys. <br />Bristol/State College BRT Corridor TSS Implementation Services deliverables (in <br />part to include): <br />Ala. Revised signal timing plans and progress reports documenting the <br />changes. <br />Alb. Provide TMS event logs and support activity logs. <br />Scope of Work 100 05/18/1 O