Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />During each of the six (6) required support periods, CONSULTANT shall monitor <br />the Westminster/17th Street BRT Corridor via the Traffic Management System <br />(TMS) software (if applicable), and perform field surveys of the Westminster/17th <br />Street BRT Corridor to observe the traffic patterns, recommend fine-tuning, and, <br />if approved by AUTHORTY in writing, fine tune the signal timing based upon the <br />surveys. <br />Westminster/17th Street BRT Corridor TSS Implementation Services deliverables <br />(in part to includej: <br />C1a. Revised signal timing plans and progress reports documenting the <br />changes. <br />C1 b. Provide TMS event logs and support activity logs. <br />Scope of Work 102 05/18/1 O