Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />26 ggc Harbor Boulevard BRT Corridor -Action Item 3 2 8 <br /> Matrix <br /> Westminster/17 Street BRT Corridor - <br />27 C6a Technical memorandum detailing findings of the 3.3.6 <br /> desi n hase documentation review <br /> Westminster/17 Street BRT Corridor -All Final <br /> optimized and synchronized traffic signal timing <br /> plans in Synchro format and the preferred timing <br />28 C7a chart format of each agency, including (a) 3 <br />3 <br />7 <br /> existing corridor conditions and (b) planned and . <br />. <br /> programmed improvements (widening projects <br /> and intersection improvements) within the next <br /> five ears after NTP . <br />29 C7b Westminster/17` Street BRT Corridor -Final 3 <br />3 <br />7 <br /> Time-Space Diagrams . <br />. <br /> <br />30 <br />C7c Westminster/17 Street BRT Corridor -Final <br />7 <br />3 <br />3 <br /> Signal Timing Optimization Plan . <br />. <br /> Westminster/17 Street BRT Corridor - <br />31 C7d Electronic Synchro 7.0 data files used in the Final 3.3.7 <br /> anal sis <br /> Westminster/17 Street BRT Corridor - <br />32 C7e Electronic Sim Traffic data files used in the Final 3.3.7 <br /> anal sis <br /> Westminster/17 Street BRT Corridor - <br />33 C7f Electronic Versions of the Final analysis and all 3.3.7 <br /> data files includin the Tru-Traffic TS/PP files <br />34 C8a Westminster/17 Street BRT Corridor -Project 3.3 <br />8 <br /> Meeting Agendas . <br />35 C8b Westminster/17 Street BRT Corridor -Project 3.3.8 <br /> Meeting Minutes and Action Items <br />36 C8c Westminster/17` Street BRT Corridor -Action 3.3.8 <br /> Item Matrix <br />SECTION 4.0 TRAFFIC SIGNAL SYNCHRONIZATION IMPLEMENTATION <br /> Bristol/State College BRT Corridor -Technical <br /> memorandum containing field implementation of <br /> optimized traffic signal plans for existing corridor <br />37 Ala conditions, including all required fine tuning and 4.2 <br /> timing charts as requested by AUTHORITY and <br /> agency, and final signal timing implementation <br /> Ian. <br /> Bristol/State College BRT Corridor -List of <br />38 Ala Materials, Units, and Prices 4'2.1 <br />Scope of Work 107 05/1 8/1 O