My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:52:32 AM
Creation date
1/14/2011 8:39:42 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA
Contract #
N-2011-005
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />shall erform satisfactoril in service. <br />R <br />Route: See Corridor. <br />S <br />Schedule: A timetable which identifies each specific bus number, Direction of travel, <br />fre uenc ,and arrival times at each Sto <br />Scope Of Work (SOW): Section of the Contract Documents that defines all of the work <br />elements to be rovided as art of the CONTRACT. <br />Significant Implementation Milestone: Work that has reached an advanced level or <br />threshold of com letion. This threshold varies for different t es of elements of work. <br />State: State of California. <br />Submittals: See Oe/iverab/es. <br />T <br />Testing: The process whereby the CONSULTANT verifies that the Components, <br />equipment, subsystems, systems and Interfaces function as specified and Interface <br />safel and ro erl with each other. <br />Test Reports: Reports of tests signed by qualified professional attesting that tests were <br />performed in accordance with the test method specified, that the test results reported <br />are accurate, and that items tested meet or fail to meet the stated re uirements. <br />Transportation Management Center: A facility housing the operations management <br />centers. <br />V <br />Value Engineering: A formal and defined method of optimizing and balancing cost, <br />function, operation, Maintainability, overall life cycle cost, or other project parameter(s) <br />to achieve the best AUTHORITY defined value for the Pro'ect. <br />Verification: Is the act of reviewing, inspecting, Testing, checking, auditing, or <br />otherwise establishing and documenting whether items, processes, services, or <br />documents conform to s ecified re uirements. <br />W <br />Scope of Work 116 05/18/1 O
The URL can be used to link to this page
Your browser does not support the video tag.