Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />1 .2.2 HARBOR BOULEVARD BRT CORRIDOR <br />Optimized signal timing and synchronization shall be implemented at the <br />following roadway segments along the Harbor Boulevard BRT Corridor including <br />additional intersections beyond the corridor limits due to short roadway segments <br />and/or to maintain existing synchronized zones: <br />1 . Chapman Avenue from Euclid Street to the SR-57 ramps. <br />2. Harbor Boulevard from Brea Boulevard to Newport Boulevard. <br />Table 1-3 summarizes the number of signalized intersections per agency along <br />the Harbor Boulevard BRT Corridor including additional intersections beyond the <br />BRT corridor limits. <br />Scope of Work 13 09/09/1 O