My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0825)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0825)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:44:33 PM
Creation date
1/14/2011 8:39:42 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0825)
Contract #
N-2011-005
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />TABLE 7 -5 <br />TSS Design Phase Task Completion Status <br />TSS Design Phaae Taak Task pelluerable C©mpl?Uon Status File.... <br />Format <br />TSS Study Alignment <br />Verification TSS Alignment Final Report • Completed by others. PDF and <br />MS Word <br /> Data Collection Report including PDF, MS <br /> existing timing sheets and as-built • Completed by others. Word and <br /> drawings. MS Excel <br />Data Collection 24-hour traffic counts • Completed by others. MS Excel <br /> Axle classification counts • Completed by others. MS Excel <br /> Intersection peak period turning • Completed by others. MS Excel <br /> movement traffic counts <br /> Field Inventory Report • Completed by others. PDF and <br />MS Word <br />Inventory of Existing Traffic PDF <br />MS <br />Signals, Field Masters/Hubs Field Review Summary Sheets of .Completed by others. , <br />Word and <br />Locations, Signal each signalized intersection MS Visio <br />Communications, and Traffic <br />Management Systems photographs of each intersection <br />PDF and <br /> including the location and inside of • Completed by others. MS Word <br /> each signal controller cabinet <br /> PDF, MS <br /> "Before" Study Project Report .Completed by others. Word and <br />" <br />" MS Excel <br />Before <br />Study <br /> Floating car data using PC Travel <br />• Completed by others. PDF and <br />PC Travel <br /> software data files <br /> • Completed by others and pDF and <br /> Draft optimized and synchronized submitted to Agencies for Synchro <br /> traffic signal timing plans produced initial review. Agency 7.0 data <br /> with Synchro comment collection and <br />files <br /> coordination not completed. <br /> • Completed by others and PDF and <br /> Draft Time-Space Diagrams submitted to Agencies for Tru - <br /> produced with Tru-Traffic TS/PP initial review. Agency Traffic <br /> comment collection and TS/PP <br /> coordination not completed. data files <br />Signal Timing Optimization • Completed by others and <br /> Draft Signal Timing Optimization submitted to Agencies for PDF, MS <br /> Plan initial review. Agency Word and <br /> comment collection and MS Excel <br /> coordination not completed. <br /> Final optimized and synchronized <br /> traffic signal timing plans produced • Nat completed. None <br /> with Synchro <br /> Final Time-Space Diagrams • Not completed. None <br /> produced with Tru-Traffic TS/PP <br /> Final Signal Timing Optimization .Not completed. None <br /> Plan <br />Scope of Work 18 09/09/'1 O
The URL can be used to link to this page
Your browser does not support the video tag.