Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />process of the signal synchronization along the Bristol/State College BRT <br />Corridor. <br />CONSULTANT shall attend meetings as directed by AUTHORITY and agencies <br />to discuss specific information and requirements related to the signal <br />synchronization along the Bristol/State College BRT Corridor. <br />Meetings will also consist of any specific meeting called by AUTHORITY and <br />agencies, at which CONSULTANT's attendance is required. <br />It is required that in the TSS Design Finalization Phase, CONSULTANT, <br />AUTHORITY, and agencies (if available), conduct bi-weekly meetings in order to <br />provide a continuous dialogue and develop a team relationship for the success of <br />this project. <br />CONSULTANT shall prepare and distribute meeting minutes and action item <br />matrix to the project team within five (5) days from the meeting. AUTHORITY <br />and/or its designee shall be provided with draft meeting agendas for their review <br />and written approval prior to the preparation of final meeting agendas. <br />AUTHORITY and/or its designee shall be provided with draft meeting minutes for <br />their review and written approval prior to the distribution of final meeting minutes. <br />AUTHORITY and/or its designee shall be invited and shall participate at every <br />meeting. <br />Bristol/State College BRT Corridor TSS Design deliverables (in part to include): <br />A8a. Project Meeting Agendas. <br />Abb. Project Meeting Minutes and Action items. <br />A8c. Action Item Matrix. <br />3.2 PART "B" -HARBOR BOULEVARD BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES <br />3.2.1 TASK B-1: HARBOR BOULEVARD BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES -KICK-OFF MEETING <br />CONSULTANT shall have akick-off meeting with the AUTHORITY to discuss the <br />following: <br />1 . Harbor Boulevard BRT Corridor alignment <br />2. List of arterial/collector roads <br />3. List of signalized intersections <br />4. Other projects along the Harbor Boulevard BRT Corridor <br />Scope of Work 41 05/18/1 O