Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />Previous consultant prepared a "Before" Study Project Report and finalized the <br />"Before" Study Project Report based on comments received from the <br />AUTHORITY. <br />AUTHORITY shall provide an electronic copy, in MS Word, MS Excel, and <br />Adobe Acrobat (PDF) format, of the completed and AUTHORITY approved <br />Harbor Boulevard BRT Corridor "Before" Study Project Report for CONSULTANT <br />review and background information. <br />CONSULTANT shall provide a section in the technical memorandum deliverable, <br />as described in Section 3.2.6 to AUTHORITY detailing the findings of the <br />completed "Before" Study Project Report review. <br />3.2.6 TASK B-6: HARBOR BOULEVARD BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES -COMPLETED DESIGN PHASE <br />DOCUMENTATION REVIEW <br />CONSULTANT shall review all completed design phase documentation by others <br />listed above in Sections 3.2.2 through 3.2.5 and below in Section 3.2.7. <br />CONSULTANT shall prepare a technical memorandum detailing findings of the <br />design phase documentation review. The report shall contain, but not be limited <br />to, the following: <br />a. Review Findings <br />b. Deficiencies <br />c. Changes of Existing Field Conditions (lane configuration, signal phasing, <br />etc. ) <br />d. Missing Information /Incomplete Information <br />e. Information required to update the completed design phase <br />documentation by others <br />f. Recommendations Required to Complete the Remaining TSS Design <br />Finalization Tasks <br />The report shall be provided in sections in accordance to each design phase <br />document reviewed. <br />Harbor Boulevard BRT Corridor TSS Design Finalization Services deliverables <br />(in part to include): <br />B6a. Technical memorandum detailing findings of the completed design phase <br />documentation review. <br />3.2.7 TASK B-7: HARBOR BOULEVARD BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES -SIGNAL TIMING OPTIMIZATION <br />Scope of Work 48 OS/18/1 O