Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />stops, fuel consumption reduction, pollution reduction, and other pertinent items. <br />The identified MOE's were compiled for the corridor using the floating car method <br />and Synchro 7.0. <br />For the "Before" field study, previous consultant conducted a minimum of five (5) <br />floating car "runs" in each direction and during all periods in which <br />synchronization plans were developed. <br />The completed report addresses optimization strategies for signal <br />synchronization, specifically focusing on how to synchronize the <br />Westminster/17th Street BRT Corridor (i.e. end-to-end optimization and/or <br />coordinated zones). The report defines the traffic patterns along the <br />Westminster/17th Street BRT Corridor throughout the day and throughout the <br />week. <br />The analysis was based on all floating car data collected using a GPS device <br />and PC Travel software. AUTHORITY shall provide all PC Travel data files and <br />an electronic copy, in Adobe Acrobat (PDF) format, of the PC Travel summary <br />reports for CONSULTANT review and background information. Previous <br />consultant prepared a "Before" Study Project Report and finalized the "Before" <br />Study Project Report based on comments received from the AUTHORITY. <br />AUTHORITY shall provide an electronic copy, in MS Word, MS Excel, and <br />Adobe Acrobat (PDF) format, of the completed and AUTHORITY approved <br />Westminster/17th Street BRT Corridor "Before Study" Project Report for <br />CONSULTANT review and background information. <br />CONSULTANT shall provide a section in the technical memorandum deliverable, <br />as described in Section 3.3.6 to AUTHORITY detailing the findings of the <br />completed "Before" Study Project Report review. <br />3.3.6 TASK C-6: WESTMINISTER/17TH STREET BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES -COMPLETED DESIGN PHASE <br />DOCUMENTATION REVIEW <br />CONSULTANT shall review all completed design phase documentation by others <br />listed above in Sections 3.3.2 through 3.3.5 and below in Section 3.3.7. <br />CONSULTANT shall prepare a technical memorandum detailing findings of the <br />design phase documentation review. The report shall contain, but not be limited <br />to, the following: <br />a. Review Findings <br />b. Deficiencies <br />c. Changes of Existing Field Conditions (lane configuration, signal phasing, <br />etc. ) <br />d. Missing Information /Incomplete Information <br />Scope of Work 59 05/'18/'1 O