My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:52:32 AM
Creation date
1/14/2011 8:39:42 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA
Contract #
N-2011-005
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />Bristol/State College BRT Corridor TSS Implementation Services deliverables (to <br />in part include): <br />Ala. List of Materials, Units, and Prices. <br />Alb. Copies of All Purchase Orders and Product Manuals. <br />4.2.3 TASK A-3: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES -EQUIPMENT INSTALLATION SCHEDULING <br />OF WORK <br />CONSULTANT shall provide an equipment installation schedule for the <br />Bristol/State College BRT Corridor showing the activities, days, and locations <br />that the equipment will be installed and tested. The installation schedule shall <br />also indicate any implementation work that may be conducted by others at the <br />same intersections under separate projects. <br />CONSULTANT shall furnish AUTHORITY with four (4) hard copies and four (4) <br />electronic copies (in a media approved in writing by AUTHORITY) of a written <br />timetable showing the proposed schedule of work. The schedule of work shall <br />be submitted for approval to AUTHORITY and the agencies at least thirty (30) <br />days prior to the beginning of the equipment installation and shall be updated on <br />a monthly basis thereafter for the duration of the TSS Implementation Phase. <br />Bristol/State College BRT Corridor TSS Implementation Services deliverables (in <br />part to include): <br />A3a. Signal Synchronization Equipment Installation Schedule. <br />4.2.4 TASK A-4: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES -EQUIPMENT INSTALLATION <br />COORDINATION, INSTALLATION MANPOWER, AND INSTALLATION <br />RESTRICTIONS <br />CONSULTANT shall coordinate installation, modification, and/or upgrade of <br />traffic signal equipment with the AUTHORITY and the agencies. CONSULTANT <br />shall coordinate the work of the various trades and crafts to avoid possible <br />interferences, duplication of work, or unfinished gaps, and conflicts between <br />operations. The various trades and crafts shall agree that, due to field <br />conditions, minor departures from the improvement plans are bound to occur, <br />and that such departures are self compensation so far as cost of additions or <br />deductions are concerned. No claims for extras or time extensions will be <br />allowed in connection with such minor changes due solely to field conditions. <br />It shall be construed that each subcontract is an integral part of the CONTRACT <br />and CONSULTANT shall provide and maintain, in full operation, at all times <br />during the performance of the CONTRACT, a "sufficient" crew of laborers, <br />Scope of Work 70 OS/18/1 O
The URL can be used to link to this page
Your browser does not support the video tag.