My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:52:32 AM
Creation date
1/14/2011 8:39:42 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA
Contract #
N-2011-005
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />Harbor Boulevard BRT Corridor TSS Implementation Services deliverables (in <br />part to include): <br />Boa. Signal Synchronization Equipment AUTHORITY/agencies Notifications. <br />4.3.5 TASK B-5: HARBOR BOULEVARD BRT CORRIDOR TSS IMPLEMENTATION <br />SERVICES -EQUIPMENT INSTALLATION GUARANTEE <br />CONSULTANT shall guarantee the entire work installed by it under this <br />CONTRACT and will fully meet all requirements as to quality of workmanship <br />and labor furnished by it. CONSULTANT shall make, at its own expense, any <br />repairs or replacements made necessary by defects in workmanship and labor <br />furnished by it that become evident within one (1) year after BRT Final <br />Acceptance of the work for all corridors and to restore to full compliance with the <br />requirements, any part of the work which during the one (1) year period is found <br />to be deficient with respect to any provision of the plans and specifications. <br />CONSULTANT shall make all repairs and replacements promptly upon receipt of <br />written orders from AUTHORITY or it assigned representative. If CONSULTANT <br />fails to make the repairs and replacements promptly, AUTHORITY or the agency <br />may do the work and CONSULTANT shall be liable to AUTHORITY and agency <br />for the cost. <br />Firmware and Software Upgrades for Control and Communications Systems for <br />Central, Field Master, and Local intersection controller units for installed specified <br />systems are included in the installed price for a period of 3 years. <br />New software for new features not originally installed nor specified is excluded <br />from this contract. Standard Warranties or Guarantees for new software or new <br />features are the responsibility of the agency receiving such equipment and the <br />standard warranties or guarantees supplied by the manufacturer or vendor. <br />Removal of existing equipment and appurtenances is included in the "removing, <br />reinstalling, or salvaging traffic signal equipment" installation price. <br />Attention is directed to: <br />Section 86 - 1.05 WARRANTIES, GUARANTIES, AND INSTRUCTION SHEETS <br />of the State Standard Specifications. <br />CONSULTANT shall provide a Harbor Boulevard BRT Corridor Signal <br />Synchronization Equipment Installation Guarantee Certification after <br />AUTHORITY issues Final Acceptance of all three (3) BRT corridors. <br />Harbor Boulevard BRT Corridor TSS Implementation Services deliverables (in <br />part to include): <br />B5a. Signal Synchronization Equipment Guarantee Certification. <br />Scope of Work 82 05/18/1 O
The URL can be used to link to this page
Your browser does not support the video tag.