My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05 JTPH LACY & RAITT EX3
Clerk
>
Agenda Packets / Staff Reports
>
Housing Authority (1999 - Present)
>
2009
>
01-05-2009
>
05 JTPH LACY & RAITT EX3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:30:47 PM
Creation date
1/19/2011 11:47:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
05
Date
1/5/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. CITIZEN PARTICIPATION <br />As the process for considering the Project moves forward, the Developer -will observe the <br />following protocol: <br />1. Provide affected tenants with full and timely access to documents relevant to the <br />relocation program; <br />2. Encourage meaningful participation in reviewing the relocation plan and <br />monitoring the relocation assistance program; including the Project area <br />occupants, neighborhood groups and community organizations forming a <br />relocation committee; <br />3. Provide technical assistance necessary to interpret elements of the Relocation Plan <br />and other pertinent materials; <br />4. Issuance of a general notice concerning the availability of the Plan for public <br />review, as required, 30 days prior to its proposed adoption; <br />5. The inclusion of written or oral comments concerning the Plan and the <br />Developer's response as an attachment when it is forwarded to the appropriate <br />governmental body for approval. <br />F. PROJECTED DATE OF DISPLACEMElvT <br />The Developer anticipates that the earliest 90-day Vacate Notices will be issued is May 2009. <br />G. ESTIMATED RELOCATION COSTS <br />The total. budget estimate for relocation-related payments for this Project, including a 10% <br />contingency, is $49,400. <br />The estimated relocation budget does not include any payments related to property acquisition. <br />In addition, the budget does not consider the cost of any services necessary to implement the <br />Plan and complete the relocation element of the Project. <br />If the Project is implemented, and circumstances arise that should change either the number of <br />residential occupants, or the nature of their activity, the Developer will authorize any additional <br />funds that may need to be appropriated_ The Developer pledges to appropriate, on a timely basis, <br />the funds necessary to ensure the successful completion of the Project, including funds necessary <br />for LRH as indicated in section IV, E, of this Plan to meet its obligation under the relocation <br />regulations. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.