My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (6)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ALL AMERICAN ASPHALT (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 11:40:17 AM
Creation date
1/20/2011 12:28:08 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
11-6737
Agency
Public Works
Council Approval Date
1/18/2011
Destruction Year
2016
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Claudia C. Alvarez <br />COUNCILMEMBERS <br />David Benavides <br />Carlos Bustamante <br />Michele Martinez <br />Vincent F. Sarmiento <br />Sal Tinajero <br />December 14, 201 O <br />ADDENDUM No. ONE <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY M-36 <br />P.O. Box 1988 <br />Santa Ana, California 92702 <br />CITY MANAGER <br />David N. Ream <br />CITY ATTORNEY <br />Joseph W. Fletcher <br />CLERK OF THE COUNCIL <br />Maria D. Huizar <br />SUBJECT: PROJECT No_ 11-6737: Santiago Street Rehabilitation, Sixth Street to <br />Santa Ana Boulevard <br />The following changes have been made to specifications of the subject project: <br />Specifications <br />1. Page 2, Section 1.04 LIQUIDATED DAMAGES. Insert the following after <br />paragraph 1: <br />"Project Phasing <br />As referenced in Section 4.02, Phases I, III, IV, and V shall be completed within <br />five (5) working days and Phase II shall be completed within one (1) weekend. <br />Work shall proceed in a timely fashion until the work is completed to the <br />satisfaction of the Engineer. Liquidated damages, at the rate of $2,400 per <br />working day, shall be assessed for failing to complete each project phase within <br />the abovementioned timeframe." <br />2. Page 20, Section 2.15 POTHOLE UTILITIES. Replace with the following: <br />"This section shall conform to Section 5: Utilities of the Standard Specifications <br />and these Special Provisions. <br />Contractor shall determine the location and depth of all utilities and shall <br />coordinate as needed with the respective owners. <br />Payment for Pothole Unmarked Utilities shall be paid per each on an as-needed <br />basis, for utilities not shown on the plans, and as determined by the Engineer. <br />Potholing Utilities shown on the plan shall be included in the other items of work <br />involved and no additional compensation shall be allowed therefore. Payment <br />shall include full compensation for furnishing all materials, labor, equipment, <br />traffic controls, all associated costs and incidentals for doing each pothole plus <br />replacing hole and surface in kind and no additional compensation will be <br />allowed therefore."
The URL can be used to link to this page
Your browser does not support the video tag.