Laserfiche WebLink
KORNiX. INC. <br />GENERAL ENGINEERING CONTRACTOR <br />193 14 AVENIDA DEL S(7L. WALNt1T 91789 <br />PH()NE:(909)595-6104 FAX:(909)595_9()8f, <br />Project References <br />County of Orange Public Works Dept. <br />300 North Flower Street. Santa Ana. C A 92703 <br />Olive Island Sidewalk Imp. $305.000 <br />Bob Stanfield--Project Manager (71-3) 936-97 ; 1 <br />90% of own work forced used <br />Completed: 8/38/09 <br />City of Alhambra <br />I 1 1 South 1 st Street. Alhambra. CA 91 801 <br />2008 HUD Funded Sidewalk Curb & Gutter Repair $143.213.51 <br />Amanda Eitel-Project Manager (636) 570-5063 <br />1001/6 of own work force used <br />Completed: 9/ 1 /09 <br />City of Santa Ana Public Works Dept. <br />20 Civic Center Plaza. Santa Ana. CA 92702 <br />Channel Inlet Mod. $1 10.375 <br />William Albright-Assistant Engineer (714) 647-5029 <br />90% of own work force used <br />Completed: 9/ 1 0/09 <br />City of Santa Fe Springs <br />1 1 710 E. Telegraph Road. Santa Fe Springs. CA 90670 <br />Sorrenson Ave Sidewalk Imp. $ 155.039.77 <br />Robert Garcia-Project Manager (562) 868-051 1 ext. 7545, <br />95% of own work forced used <br />Completed: 1 0/ 1 9/09 <br />Citv of South Pasadena <br />1414 Mission Street. South Pasadena. CA 91030 <br />Oak Street Sidewalk Replacement Project $39.387.37 <br />Gabriel Nevarez-Project Manager (626) 403-7248 <br />100% own work forced used <br />Completed 1/15/10 <br />City Of Buena Park <br />6650 Beach Bvld. Buena Park. CA 90633 <br />Improvements of Al leyways from 1 1 th Street to I Oth Street <br />and From Pacific Avenue to Tulare Street $63.591.01 <br />Neda Ghazvini Project Manager (714) 562-3689 <br />951/6 of own work force used <br />Completed 1/28/10