My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/24/2001
Clerk
>
Minutes
>
Planning Commission
>
2001
>
09/24/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:58:10 PM
Creation date
1/28/2011 2:34:47 PM
Metadata
Fields
Template:
PBA
Doc Type
Minutes
Date
9/24/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Announced there would be a public hearing of the State Assembly on Friday, <br />September 28 to discuss rights-of-ways and how telecommunication companies use <br />them on state, city and county properties regulated through the P.U.C. <br />Commissioner Richardson <br />• Noted he was happy to be back. <br />• Noted in minutes from previous meeting Commissioner Verino's comments about the <br />swap mall on West First Street adding that when the swap mall was approved, there <br />was a conditional use permit that accompanied the project and might be worthy of <br />' research. <br />• Requested update on his request to place Camphor trees on the south side of Santa <br />Ana Boulevard from Grand Avenue to the railroad tracks. <br />Commissioner Cribb <br />• Requested staff investigate traffic signal at MacArthur Boulevard and Imperial <br />Promenade noting on weekends the light does not turn green for those coming south <br />on Imperial Promenade to MacArthur. <br />• Requested an inspection of BRE Project noting the opening has been delayed from <br />October 16 until October 27 which has caused a negative impact on their ability to <br />lease property. <br />• Requested that staff encourage BRE to place the panels on all four sides of the <br />columns on the ground level of the condominium units, which currently has the <br />panels placed on three sides only. <br />• Inquired on status of discussion on retail uses at Hutton Centre. Ms. Nelson <br />answered that staff will be processing a zone change that will be presented to the <br />Commission in January 2002. <br />9. Excuse of Absences <br />Motion by Commissioner Cribb and seconded by Commissioner Doughty to excuse the <br />absence of Commissioner Verino and approved unanimously by a vote of 6:0. <br />10. Adjournment <br />The meeting adjourned at 8:23 p. m. <br />L~ ,q <br />Rosa Barela J~/~`/~ <br />Acting Recording Secretary <br /> <br />PLANNING COMMISSION MINUTES 7 SEPTEMBER 24, 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.