My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TUSTIN, CITY OF (4) -2011
Clerk
>
Contracts / Agreements
>
T
>
TUSTIN, CITY OF (4) -2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2017 11:23:45 AM
Creation date
1/28/2011 3:11:09 PM
Metadata
Fields
Template:
Contracts
Company Name
TUSTIN, CITY OF
Contract #
A-2011-025
Agency
PUBLIC WORKS
Council Approval Date
1/18/2011
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW, THEREFORE, the parties agree as follows: <br />TUSTIN Rights and Duties: <br />TUSTIN shall be the lead agency for the work and shall provide all <br />construction management. TUSTIN shall be solely responsible for the <br />preparation and award of the contract pursuant to public bid requirements for <br />the construction of the PROJECT, including the portion of the PROJECT that <br />is in SANTA ANA. TUSTIN shall be responsible for the preparation of all <br />legal documents, including the Notice Inviting Bids, Instruction to Bidders, and <br />the related construction contract, surety bonds and insurance certificates. <br />TUSTIN shall be solely responsible for the administration and performance of <br />the contract awarded to the contractor for the construction of the PROJECT. <br />2. Tustin shall pay for all PROJECT design, materials testing, site survey, <br />construction engineering and construction management. <br />3. TUSTIN shall pay its proportionate share of construction cost, as estimated in <br />Recital G and Exhibit "A" of this Agreement. <br />4. In the event the sealed bids submitted by the lowest responsive/responsible <br />bidder for the construction of the PROJECT show that SANTA ANA's portion <br />of the PROJECT costs will exceed the estimated cost by ten percent (10%), <br />TUSTIN shall not award such contract and shall not bind SANTA ANA <br />hereunder without the prior written consent of SANTA ANA. <br />5. TUSTIN shall notify SANTA ANA in writing of any changes, increased costs, <br />and pertinent meetings (i.e., pre-construction, site, and final walk through), <br />associated with TUSTIN's lead agency responsibilities for the PROJECT. <br />6. Change orders for work within SANTA ANA must receive the written approval <br />of the Executive Director of the Public Works Agency of SANTA ANA prior to <br />implementation, which approval shall not be unreasonably withheld. SANTA <br />ANA shall have a minimum of five (5) working days to review and approve <br />change orders. SANTA ANA shall have inspection authority within SANTA <br />ANA jurisdictional boundaries and shall be notified of the progress of the <br />PROJECT for such purposes. SANTA ANA shall also have the right to enter <br />and inspect within TUSTIN boundaries at all times for the purposes of <br />overseeing TUSTIN lead agency functions. <br />7. TUSTIN shall have the exclusive right of approval of all plans, specifications <br />and cost estimates prepared by consultants for the portion of the PROJECT <br />within the jurisdictional boundaries of TUSTIN. <br />8. TUSTIN shall advertise and award the contract for the PROJECT in <br />accordance with federal, state and local laws. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.