Chapter 1 - Introduction <br />The City of Santa Ana (City) adopts the following Findings of Fact in connection with the San <br />Lorenzo Lift Station Project (Project). Such Findings must be adopted by the City pursuant to the <br />requirements of Section 21081 of the California Environmental Quality Act (CEQA) (Public <br />Resources Code §21000 et seq.) and Section 15091 of the State CEQA Guidelines (CEQA <br />Guidelines) (14 Cal. Code Regs. §15000 et seq.) prior to approval of a project for which an <br />Environmental Impact Report (EIR) has been certified which identifies one or more significant <br />environmental effects. The City also adopts the Statement of Overriding presented in Chapter 4 of <br />this document, which provides the specific reasons that the Project's economic, legal, social, <br />technological, or other benefits outweigh its adverse environmental impact. <br />This document is organized as follows: <br />Chapter 1 Introduction to the Findings of Fact and Statement of Overriding <br />Considerations. <br />Chapter 2 CEQA Findings of Fact regarding the significant environmental impacts of <br />the Project and the mitigation measures for those impacts identified in the <br />Environmental Impact Report (EIR) prepared for the Project and adopted as <br />conditions of approval. <br />Chapter 3 Findings regarding the alternatives to the Proposed Project evaluated in the <br />EIR and the reasons that such alternatives were rejected or accepted. <br />Chapter 4 Statement of Overriding Considerations explaining the specific reasons that <br />the Project's economic, legal, social, technological, or other benefits <br />outweigh its adverse environmental impact. <br />Brief Proiect Description <br />The San Lorenzo Lift Station project area is located at the western terminus of San Lorenzo Avenue, <br />immediately north of West Segerstrom Avenue and south of an existing alley. The sewer lift station <br />would replace the existing Segerstrom Lift Station, which is located beneath South Bristol Street <br />approximately 700 feet to the west of the new lift station site. <br />As described in Section F.2 of the Final EIR, Revisions to the Proposed Project, minor revisions <br />have been incorporated into the design of the proposed San Lorenzo Lift Station facility. <br />Specifically, in response to objections from an adjacent property owner regarding the Project's <br />proposal to condemn approximately 292 s.f. of privately-owned property, the City has redesigned of <br />the proposed facility so as to avoid the need for condemnation of privately owned land. As depicted <br />in Final EIR Error! Reference source not found., Conceptual Revised Lift Station Site Plan, and <br />Error! Reference source not found., Originally Proposed and Conceptual Revised Lift Station Site <br />Plan, the proposed lift station facility would continue to be constructed at the west end of San <br />Lorenzo Avenue, but would be constructed along the southern alignment of San Lorenzo Avenue and <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 1-1 <br />Findings of Fact/Statement of Overriding Considers tb _ 11