My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - EIR SAN LORENZO SEWER LIFT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/07/2011
>
55B - RESO - EIR SAN LORENZO SEWER LIFT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:53:43 PM
Creation date
2/1/2011 4:12:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
55B
Date
2/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter I Introduction <br />The Project will consist of a newly constructed lift station that will be housed within a block structure. <br />The following facilities will be installed within or beneath the block structure: electrical panels and <br />control center; a below-ground wet well of sufficient size and depth to prevent back up and <br />surcharging of the upstream sewer mains; a below-ground dry well to house the pumps, motors, <br />associated equipment and appurtenances; a gravity odor control system; and a stairway access into <br />the dry well. <br />Landscaping and hardscape improvements are included as part of the new lift station. The Project <br />includes the repaving of a portion of the western end of San Lorenzo Avenue, portions of an existing <br />alley, and a portion of West Segerstrom Avenue, along with the installation of new sidewalks in <br />areas where existing sidewalks have fallen into a state of disrepair and/or will be demolished during <br />lift station construction. Some existing landscaping along West Segerstrom Avenue will remain. <br />The Project also includes the installation and operation of approximately 1,300 linear feet of new <br />underground sewer infrastructure, including approximately 560 linear feet of 15-inch gravity sewer <br />pipe; approximately 190 linear feet of 12-inch gravity sewer pipe; approximately 545 linear feet of <br />10-inch force main; and sewer manholes and appurtenances. Construction of these new facilities will <br />occur beneath the paved rights-of-ways of South Bristol Street and West Segerstrom Avenue. The <br />new infrastructure will be needed to connect several existing sewer mains to the new proposed San <br />Lorenzo Lift Station. <br />After construction of the San Lorenzo Lift Station is complete and the new subsurface sewer pipes <br />and manholes are installed, the new lift station will move effluent through the station and into gravity <br />sewer lines, which will convey the sewerage to the Orange County Sanitation District's (OCSD) <br />Reclamation Plant No. 1, located in the City of Fountain Valley adjacent to the Santa Ana River. <br />Effluent will continuously flow through the San Lorenzo Lift Station and will not be stagnant. The <br />new lift station will replace the Segerstrom Lift Station and will not increase the capacity of the <br />City's existing sewer system. The new lift station facility will be constructed with odor control <br />devices and the City will regularly monitor the facility to ensure it is functioning properly. <br />After the new San Lorenzo Lift Station has been constructed and is in operation, demolition of the <br />existing Segerstrom Lift Station will occur. Demolition activities will involve abandonment in place <br />of the existing lift station, including the removal and disposal of all lift station equipment and filling <br />of the existing wet well manhole with sand. An existing generator, located southerly of the existing <br />lift station, will remain in place and will serve as a back-up power source for the proposed new San <br />Lorenzo Lift Station. Some removal and replacement of existing sidewalk and roadway pavement <br />will occur in association with proposed demolition activities. Demolition of the existing Segerstrom <br />Lift Station will occur in conformance with all applicable federal, state, and local regulations and <br />standards. Resurfacing of roadway segments disturbed by Project construction will occur. <br />CEOA Compliance <br />As described in Section 1.3.1 of the Draft EIR, the City originally prepared and processed a <br />Mitigated Negative Declaration (MND) for the proposed Project in December 2008. The MND and <br />was adopted by the City Council on February 2, 2009. However, the MND was challenged in <br />California Superior Court by an adjacent property owner, and the Court ordered the lead agency to <br />vacate its approval of the MND and required preparation of a project EIR. The City published a <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 1-1 <br />Findings of Fact/Statement of Overriding Consider658 _ 13
The URL can be used to link to this page
Your browser does not support the video tag.